My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1930/07/07 Council Minutes
>
Council Minutes
>
1930/07/07 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 1:22:43 AM
Creation date
9/27/2020 10:06:58 PM
Metadata
Fields
Template:
Council Minutes
Date
7/7/1930
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
61.5 <br /> JULY 7th,1930 <br /> The Regular Administrative Beseiop of the City Council wee held <br /> July 7th,1950,10-30 A.M.,Mayor Martin in the Chair,Commie8daner <br /> Rasmussen present,pommiesioner Reinerteen present at roll,oall„ <br /> Minutee of July 5th,1930 read and approved ae of record. <br /> Coved by Rasmussen.oeconded by Martin,that the bid of Rumsey& <br /> Xorden,for the control struotpres et Section 2,awd that of the Coyle <br /> ' Construction Company,for tWe control etruoturee at Section 1,Sultan <br /> River Project No.2.be accepted at the following unit price,aubject <br /> to the approval of the'respective bonding:companies,to be oovered bY <br /> extra work orders. Bide as follows: <br /> Section 2:.Concrete 150 Cu.Yds. 6$25.00 Cu.Td. <br /> Reinforcing Steel 25000 Lbs. .05 lb. <br /> Setting Gate:,Rwuling Etc., 0.4 <br /> 12000 Lbs. 0 .08 Ido. <br /> • Structural Steel Reek.,ktc. <br /> Furnishing and Placing 0 .1j Lb. <br /> 12.Vent Pipe,furnishing And <br /> PlaOing 14'Long C$40.00 Lump Sum <br /> Grouted Paving,2.Ca.'Jae l' <br /> thick,or more <br /> Lumber in Deck 2000 FEN 11:::: 'd. <br /> Excavation other than Portal <br /> litoavn 500 CY a al:ad Cu.Yd.. <br /> Section 1:“Reinfdroing Steel in Placa .07 Per lb. <br /> Steel Taper Sections Furnished <br /> and in Place - .02 Per lb.(Tnoluded <br /> lin.15/lb to St. <br /> Tank&Pipe Co.) \ <br /> Structural Steel in Plaoe .17 Per lb. <br /> 1.41 <br /> Reuling and getting Gates and <br /> Stands(from 1Wnroe) .031-Per lb. <br /> Handrail Complete(2 raile and <br /> POet0) 1.75 Per ft. <br /> • <br /> Grouted Paving 9.00 Pei cu.yd. <br /> Concrete j..5 Bble/cu yd. <br /> Excavation for Structures- 27.8.Per ou.yd. <br /> Gasmen 1.50 Per eu.yd. <br /> Excavation for Structures- <br /> Solid Rook 3.50 Per ou.yd." <br /> Carried.'"- <br /> Coved by Rasmueeen,seconded by Martin,tbat the Claim of Xulia C. <br /> Henry and J.8.Henry.for personal damages,be rejeoted in the sum of <br /> 51.000.00. 104 <br /> Carried./ <br /> __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.