My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1937/06/24 Council Minutes
>
Council Minutes
>
1937/06/24 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 2:18:12 AM
Creation date
9/28/2020 8:31:08 AM
Metadata
Fields
Template:
Council Minutes
Date
6/24/1937
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L L7i 170 <br /> • <br /> sm.24th,1937. <br /> The Regular Administrative Session of the City Council nes held Tune <br /> 4th,1939 at 10 em,Mayor Edwards in the Chair,Commissioners Spencer and dillies. „ <br /> dd <br /> ee¢t et roll c . <br /> Ylnualltee o4 Tune 23rd,1939 read end approved. <br /> Moved by Spencer,seconded by Williams that Resolution No.4258 be <br /> • <br /> esbinded,being a resolution entitled as follows: <br /> "RES/UNION OF INTENTION <br /> RESOLUTION NO.4258 <br /> • BE 1T RBSOLVRS BY TEE CITY COUNCIL OF EVERETT,WASHIFUTON, <br /> • THAT: It is the intention of the City Council to order the <br /> improvement of Oakes.Avenue,from 13th Street to 16th Street,by grading <br /> to proper grade,construction of cement c ruction of 6-Such <br /> Portland Cement Pavement,30-feet wide,installation of necessary drain- <br /> age,omking necessary water main changes,and doing all other work neeee- <br /> • eery in connection herewith,all in acs rdance with plane o be prepared <br /> by the City Engineer." <br /> Carried unanimously. <br /> Moved by Spencer,seconded by Edwards to extend time of hearing on <br /> orlon Ave.Exteneioe until 0010 6,1937 at 10 em. Carried. <br /> Moved by Spencer,seconded by Williams that 055010ticn No.4060 be <br /> • vdopeed as follows: " RESOLUTION NO.4262. <br /> '8188555,the Western Pipe 8 Steel Co.of California,contractors <br /> n Sultan River Project No.3,have be"n considerably delayed in Starting <br /> and prosecuting work 9n this oontreot,due to etrlkee which have delayed <br /> shipments of steel from the mills and have neoeseitated frequent changes <br /> 1¢plane, therefore <br /> BE IT RESOLVES BY TBE CITY COUNCIL OF TAE CITY OF EVERETT: <br /> TEAT an extension of time of thirty(30)calender days be greeted <br /> • the Western Pipe&Steel Co.of California on 5eotion 3,and until December <br /> • <br /> 1,1930 on Section 0,subject to approval of Public Works Administration." <br /> Carried unanimously. <br /> • <br /> • <br /> { I <br /> � i 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.