|
SWT 30th,1947.
<br /> The Regular wdmin5strative session of the City Council was held at 10215,
<br /> July 30th,1947,Mayor',rends presiding,Comohet00nePI 000eLoan and Sanson presen
<br /> at roll cell.
<br /> minutes of July 29th,1947,read and approved.
<br /> Moved by 00001000,seconded by Johnson,to adopt Re0olutio.No.5231 as
<br /> 0011000, " RESOLUTION No.5231.
<br /> HE 1T RESOLVED RY TAE CITY 001N0I1.OF TAE CITY OF EVERETT,
<br /> TO MOLARS AN MAMMY end purchase without calling for bide,
<br /> the following 2eirbenke-Morse lumping equipment,it being the
<br /> only satisfactory equipment available for iamediate delivery.
<br /> 1-10^,Fig.5811,bronze-YStted,ball bearing, Split Daae pump,
<br /> mounted on structural steel base,direct connected by flexible
<br /> ouplinge to;ER,50 AP,1200 RPM,3 phase,.60 cycle,220/44C
<br /> volt,bell bearing motor. This pump is eu it.ble fox 2625 6155
<br /> at 65'Tiff.(or 3,770,000 61D1 efficiency 86.5W.
<br /> c t,Ose001 Seattle .e o1,353.12
<br /> 1-EC.tier-Aemn er a a-the-line Starter end push button for 440 volt 61.83
<br /> 2-30,Fig.5972,bronze-fitted,2-stege ball bearing,00100 ceee
<br /> • flexibles couplings mounted on to 000,a60 AP,3600 OW,3 phadistant se e60®cycle,
<br /> 220/440 volt ball bearing motors. Thee,units 4011 prod.,.
<br /> 400 OW to 400 TDA. 066.21
<br /> Net Cost f.o.b.Seattle,aeon unit .1,
<br /> 1-Cutler-Hammer across-the-line a end push button 135.66
<br /> contra/
<br /> n /Data•ova e .
<br /> 9e® 400 e.ab ro except for 2200/cite .271.42
<br /> 1-4",Fig.5812,bronze-fitted, slit ease pump,mounted o .50001
<br /> base,direct connected by flexible coupling.,bo 0EE,20nNF,
<br /> 1800 RPM,3 phase,60 cycle,20/440 volt,bell Dearing motor.
<br /> This pump will produce 625 6113 at 95'TDA. 557.29
<br /> Nat oSeattle .
<br /> 1-
<br /> Cutler-Hemmer
<br /> r across-the-lino starter and poen button for
<br /> Same eovtxol ae shave exp epC for 440 wits . •.. 38,08
<br /> 2-.128,60 AP,3600 Rim,3/60/220/440 volt,5511-bearing groes
<br /> ventilated moors
<br /> Net Cost,ae h f.o.b.,Everett,Washington 567.36
<br /> pureha,0 to be made from 5he00 Electric&m500000ry 00.,Everett,
<br /> ash.,at the prices listed above, obj05tto adjustments to Conform
<br /> IL
<br /> o market price.at the time of delivery.
<br /> 20 080004001 0x1010 in that the quipment i0 needed immediately in
<br /> 0reex to®101000 Buff 10tOht flow oP wet ex Lo the Aldemood MBn@
<br /> area. Carried.
<br />
|