My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1958/10/06 Council Minutes
>
Council Minutes
>
1958/10/06 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 6:27:55 AM
Creation date
9/28/2020 2:14:00 PM
Metadata
Fields
Template:
Council Minutes
Date
10/6/1958
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.-,..-. <br /> The Regular Administrative Session of the City Council vas held at 10 e.n. <br /> October 6,1950,Mayor CuImback presiding. Commissioners Cohort and Johnson present at roll call.. <br />• Minutes of the meeting held October 3.1958 read and approved. <br /> mom 1=th:1.411%7;7os.city budget for the year 1959 was held and continued to <br /> NEARING <br /> --- <br /> TRAFFIC Moved by 30.140fts seconded by Cohort to adopt Resolution No.6067 as follows: <br /> LIGNTS <br /> WHEREAS Section 15 of Ordinance No.3211 provides that the Chief of Police.when <br /> authorized by written resolution of the City Council,may install such traffic- <br />. control device as he may deem necessary to regulate,guide or warn traffic and <br />.II gligSZAS it Bas been found necessary.install red atop signals at the Inter- <br /> sections of Twenty-four.Street and Colby and IVenty-fif.and Colby, <br />. NC,INNSIIPOR8,BB IT MOUS°BY THS CITY COUNCIL OF 1118 CITY OF EVERETT <br />.. THAT the Chief of Police is hereby authorized to preside for the installation <br />.„ of ouch red stop lights and appropriate eigns to close the block of 2400 on <br />,, Colby to through traffic at any time during achool hours or other special <br /> c. events. <br />,., <br /> Carried. . <br />. IMP BO:MEM Moved by Cabe.,seconded by Johnson to accept the work of Hart Construction <br /> E, <br />.. ACCEPT:ID Co.for construction of Pile Trestle for pipe line,Sultan River Project No. <br />... <br /> • a Unit No.1 and to make payment as pe,Begineer'S final...mot, <br /> Carried. , <br /> i.: <br /> 1[ <br />• <br />,.. <br />,•; : <br />• <br /> 011 mo“on,the meeting adjourned at 10:20,A.M. . <br /> Bead and aPProved as of record,Oct.7,me. <br />
The URL can be used to link to this page
Your browser does not support the video tag.