Laserfiche WebLink
August 13,1963 <br /> Minutes of elle meeting Feld August 12 3 r.aa approved. <br /> TRANSFER =IsfbeYra 6saei.'3s ear a are <br /> System Pun, Carried. { <br /> L,.711`,„:5rmeaen,ti,e`enbytamaa ° 7.35ifb <br /> the .e 3 .. a�aea <br /> esxvu3E $r the construction of sewerssewers44,41 urel`nof Murphy Bros. n..contractor <br /> the amount Heights area. <br /> Carried. <br /> Metree etet <br /> E6x16,<,xE estimates os ShafferConst.Co.for me construction of Schedule enE of the <br /> Sewer Project: <br /> Estlmate No.6 Lift Station dl 914,107.66 <br /> StationEstimate 5 Lift 02 9,325.59 <br /> BEILIVete I,6 Lift Station 24,213.18 • <br /> Estimate No.7 Lift Station d4 451.28 <br /> Estimate No.6 Lift Station 8iB 2,133.97 <br /> Carried. <br /> i • <br /> 4n moa36 ... A at,Meek <br /> Read and approvei as of record,August 14,1963 nelir Mai <br />