Laserfiche WebLink
• <br /> December 11,19,4 <br /> The regular meeting f the a Council w ed. order a <br /> ethe Conference R ofvtheEv et Hall,to t '4, <br /> 19,4 awith President Alderoft presiding andallCouncilmen in attendancer e -. <br /> except Councilman Ebert. ;I <br /> DSHS WATER SYSTEM CAPITAL PROJECTS <br /> mary Haglund,Utilities Director, ted that in October,1 <br /> (Departmentmi.tPre-application o Social a Neal peal projects <br /> that the to agencies h to psxs <br /> hatywoulformd <br /> be requesting <br /> financial <br /> that stnceency <br /> onfo <br /> anticipated upcoomingila w uTth b 9 cwit assistance _..'f. <br /> 1d months. is was in-connectionwith referendum 2 <br /> statePwiae bond issue. <br /> 1 <br /> He rthes ted t aber Ifo 19 for author- <br /> ized aIERsubmittal of hPre-application formspto DSHScfor stat participation <br /> in the fundingTer prol ecs. <br /> • Haglund stated that stain has, e 2e <br /> that w now provide <br /> them TESS either(l final application,o (1 a detailing reasons s <br /> submitting te final andy receive nether, <br /> the project will be <br /> inactivated. <br /> Moved <br /> eddby Councilman M it a lettered (Cinch,cilman to DSHS stating that etaze or- <br /> ize definitely interested iistration to n these projects active. <br /> Roll was called with all Councilmen voting yes. <br /> Motion carried <br /> APPLICATION FOR DSHS LOAN <br /> Mary Haglund,Utilities Director,stated that the loan a - <br /> g for 3 n gallon r originally • <br /> recommended 1963 G Osborne report <br /> becr� 1966. owth did n t thenad <br /> the project was deferred. The project dean <br /> yep_yeer cepa,Improvementipated rate and • <br /> hP <br /> highestconsidered priority rwith design etc performed ninn the p1975 and • <br /> construction sin976. Water Pa <br /> Mr.Haglund further stated <br /> that c we included1 . <br /> in the 1975 Budget a thecondition tiWater p the <br /> objectives of the proposed study iso the <br /> asst the City in the <br /> development a <br /> five-year financial planthatwill elude capital - <br /> outlay projectseuch a his. <br /> • Haglund also stated that if <br /> Council <br /> il authorized the submittal of t <br /> hi <br /> s <br /> al next step would DSES to <br /> reviewhrequest <br /> ( wof other agencies nthe s state). <br /> thisddt <br /> Prioritize <br /> lrequests and those that d.0 enough would r <br /> final agreement. This agreement would then he s9hmitted <br /> to Council for final approval. <br /> Moved by Councilman R cke seconded by Councilman Langus to authorize <br /> Administration <br /> bmfanapplicationt lnfor e n <br /> • ning orgallon reservoir <br /> he under- <br /> standing a this project i ate <br /> ly <br /> threemonths, <br /> and at that time they will either reject or accept . <br />