VIVINITY MAP PROJECT CONTACTS W
<br />OHNER MATANA LLG
<br />BRrA0 DEC ,"_ �} �
<br />i x Ili EAST LOU15A STREET #2250� Iu�
<br />f= ri SEATTLE HA �i10�
<br />3
<br />M f
<br />B D@SEATTLERETAIL.NET
<br />,.: i..
<br />LU
<br />A
<br />MATANA LLCARCHITECT LANCE MUELLER 4 A55OGIATES �i � �� � �:�y �
<br />CONTACT: LANGE MUELLER e ° +n° " '
<br />150 LAKESIDE SUITE 250s
<br />� a. SEATTLEst SE, HA g0122 W
<br />.,
<br />a. (206) 325-2553 af
<br />FAX: (206) 32&-0554
<br />EMAIL: Irnueller@lmuellor.com
<br />GENERAL TO BE SELECTED
<br />GONTRAGTOR
<br />. x BUILDING r 'i
<br />L���TIOI�iMEDICAL OFFICE BUILDING 11 1 A I I
<br />t
<br />;f4310 Colby Avenue,
<br />APPROVED %-
<br />WA 98203 Pi-ANNING & COMMUNITY � � � � � � � �
<br />{ Everett, DEVELOPMENT DIgPT. 0 i T
<br />ro
<br />>1r€s DATE -
<br />4
<br />- ~ _J
<br />GENERAL NOTES ABBREVIATIONS1 �
<br />-- � y
<br />ADJ ADJUSTABLE / ADJACENT JAN JANITOR r
<br />wo
<br />ALT ALTERNATE JB JUNCTION BOX FIRE BONE 2 (0
<br />1. MECHANICAL & ELECTRICAL FIRE ARE BIDDER -DESIGN SYSTEMS. PORTIONS OF THIS WORK ON ARCHITECTURAL DRAWINGS ARE FOR DESIGN INTENT ONLY. AEE ABOVE FINISH FLOOR JST JOIST M ��
<br />2. MECHANICAL AND ELECTRICAL FIXTURES, OUTLETS, ETC. WHEN SHOWN ON THE ARCHITECTURAL DRAWINGS ARE FOR LOCATION INFORMATION ONLY. MECHANICAL AND ELECTRICAL TO BE DESIGNED BY OTHERS. ALL CIRCUITING
<br />ALUM ALUMINUM JT JOINT KIT KITCHEN 5EIZMIG ZONE 3
<br />COORDINATION TO BE BY OTHERS. L ANGLE LE LINEAL FOOT
<br />3. DRAWINGS ARE NOT TO BE SCALED. CONTACT ARCHITECT FOR RESOLUTION OF ANY CONFLICTS OR DISCREPANCY ANOP, ANODIZED LTG LIGHTING OCCUPANCY CROUP B
<br />44. REPETITIVE FEATURES MAY BE DRAWN ONLY ONCE, BUT SHALL BE PROVIDED AS IF DRAWN FULL. ACT AGOU5TIGAL GELLING TILE
<br />5. CONTRACTOR TO VERIFY ALL FIELD DIMENSIONS AND CONDITIONS - ANY DISCREPANCY BETWEEN PLAN AND ACTUAL CONDITION IS TO BE BROUGHT TO THE ATTENTION OF ARCHITECT FOR RESOLUTION. @ AT MAT'L MATERIAL MAX MAXIMUM TYPE OF GON5TRUGTION V B ( NON 5PRINKLEREP )
<br />6. ALL DIMENSION LINES ARE TO FACE OF CONC. AND METAL STUD WALLS AND CENTERLINE OF COLUMNS AND BEAMS, UNLESS OTHERWISE NOTED. MEGH MEGHANIGAL MED MEDIUM LOGATION ON PROPERTY N. 5ETBAGK 54.05'
<br />7. IN THE EVENT OF FIELD ERRORS OR OMISSIONS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND MARE NO REPAIRS WITHOUT APPROVAL. BLDG. BUILDING MEZZ MEZZANINE MFR
<br />6. THE CONTRACTOR SHALL- APPLY AND SECURE ALL OCCUPANCY, SEWER, STORM, WATER, ELECTRICAL AND OTHER PERMITS EXCEPT BUILDING PERMITS. CONTRACTOR SHALL PAY ALL NECESSARY FEES AND POST BONDS BLK'G. BLOCKING MANUFACTU R E. SETBACK II'-O°'
<br />REQUIRED. BM BEAM M15G M15GELL ANEOU5 S. 5ET13AGK 111-2"
<br />9. GENERAL CONTRACTOR RESPONSIBLE FOR ALL CUTTING AND PATCHING. B/5 BUILDING STANDARD MTD MOUNTED H. SETBACK 42,34'
<br />10. VERIFY LOCATION OF ALL UTILITY STUBS. MTL METAL ALLOHABFLOOR AREA
<br />11. PORTABLE FIRE EXTINGUISHERS PER NFPA 10 AND IN CONSTRUCTION SHACK, GAB CABINET BAA SIC 6000 5,F.
<br />12. PERMANENT FIRE EXTINGUISHERS BY OWNER. GIRG CIRCULATION WA NOT APPLIGABLE 5ET FLOOR bO®O 5 .
<br />NCE NG NOT IN CONTRACT SETBACK ON 5 SIDE
<br />GLR CLEAR OR GLEA I
<br />13. REFER TO BASIC BUILDING SHELL SPECIFICATIONS AND STANDARDS FOR EXISTING SHELL CONSTRUCTION (IF APPLICABLE). ALL WORK IS TO BE COMPATIBLE WITH EXISTING CONSTRUCTION. GLG GELLING NNUMBER 2.5% x 40'-20'=50
<br />14. ALL WORK SHALL CONFORM TO APPLICABLE _CURRENT FEDERAL, STATE AND LOCAL CODES. THE CONTRACTOR IS TO PROVIDE FOR ALL REQUIRED NOTIFICATION OF AND COORDINATION WITH THE CITY AND STATE AGENCIES, GL CENTERLINE NOM NOMINAL 12000 x 1.5 o I�OOO S.F.
<br />AND PROVIDE REQUIRED PERMITS, ALL TESTS AND INSPECTIONS ASSOCIATED WITH OBTAINING APPROVALS TO PROCEED WITH AND COMPLETE THE WORK SHALL BE PAID FOR BY THE CONTRACTOR. GOL GOLUMN NT5 NOT TO 56ALE
<br />15. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS, EQUIPMENT AND TRANSPORTATION NECESSARY OR REASONABLY INFERABLE AS BEING NECESSARY FOR THE EXECUTION OF THE WORK. GONG CONCRETE ACTUAL EXISTING FLOOR AREA 12,411 S.E. co
<br />BY SUBMITTING A PROPOSAL, THE CONTRACTOR REPRESENTS THAT THROUGH EXAMINATION OF THE SITE AND ALL EXISTING CONDITIONS AND LIMITATIONS HAVE BEEN MADE AND THAT THE CONTRACT DOCUMENTS HAVE BEEN CON5T CONSTRUCTION OG ON CENTER
<br />EXAMINED IN COMPLETE DETAIL, AND THAT IT IS DETERMINED BEYOND DOUBT THAT THE DRAWINGS, SPECIFICATIONS AND EXISTING CONDITIONS ARE SUFFICIENT, ADEQUATE AND SATISFACTORY FOR CONSTRUCTION OF THE GONT GONTINUOU5 OPN'G OPENING HEIGHT LIMITATIONS O
<br />WORK. WHERE MINOR ADJUSTMENTS TO THE WORK ARE NECESSARY FOR THE PURPOSES OF FABRICATION AND INSTALLATION OF ITEMS, OR RESOLUTIONS OF CONFLICTS BETWEEN ITEMS, WITHIN THE INTENT OF THE CONTRACT GOORP COORDINATE OPP OPPOSITE DOCUMENTS, THE CONTRACTOR SHALL MAKE SUCH ADJUSTMENTS AT NO ADDED EXPENSE TO THE OWNER. WHERE SUCH MINOR ADJUSTMENTS AFFECT FUNCTIONAL OR AESTHETIC DESIGN OF THE WORK, THEY SHALL BE GPT GARRET ACTUAL BUILDING HEIGHT 35,mO
<br />SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL. GT GERAMIG TILE PERP PERPENDICULAR
<br />OCCUPANT LOAD
<br />16. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER, INCLUDING AREA FOR WORK, MATERIALS STORAGE; ACCESS TO AND FROM THE WORK,. SPECIAL CONDITIONS OR NOISY WORK, TIMING OF WORK AND INTERRUPTIONS OF PL PLATE OR PLA5TIG
<br />MECHANICAL AND ELECTRICAL SERVICES. PET DETAIL LAMINATE FLOOR - 33&7 S.F. 34 PERSONS
<br />17. ALL WORK SHALT_ BE PERFORMED IN ACCORDANCE WITH THE HIGHEST STANDARD OF WORKMANSHIP IN GENERAL AND WITH SUCH STANDARDS AS ARE SPECIFIED. DIA DIAMETER PLYND PLYWOOD 2ND FLOOR - 33b7 5.F
<br />16. CONTRACTOR SHALL ADHERE TO ALL BUILDING STANDARDS. ANY CHANGE TO SAME SHALL BE SUBMITTED TO ARCHITECT IN WRITING FOR REVIEW AND APPROVAL. DIM DIMENSION PNL PANEL f1/2 3RD FLOOR OGG 51 PERSONS
<br />UJI
<br />DN DOWN PR PAIR 15T FLOOR - &00 NET 5.F.
<br />19. CONTRACTOR SHALL SUBMIT SAMPLES OF ALL FINISHES OF SUCH SIZE AND NUMBER THAT THEY REPRESENT A REASONABLE DISTRIBUTION OF COLOR RANGE AND PATTERN PRIOR TO INSTALLATION FOR ARCHITECT'S APPROVAL. +1/2 2ND FLOOR OGG 34 PERSONS LLJ
<br />CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ARCHITECT'S APPROVAL ON ALL SPECIAL ITEMS REQUIRING CUSTOM FABRICATION. DR DOOR PT PROPERTY
<br />20. CONTRACTOR SHALL PROVIDE 16 GAUGE SHEET METAL BACKING (OR APPROVED) IN PARTITIONS FOR ALL WALL MOUNTED FIXTURES, CASEWORK AND DEVICES UNLESS INDICATED OTHERWISE ON THE DRAWINGS. DHG D WING PT PAINT EXITS REGUIRED
<br />21. ALL MATERIALS INDICATED TO MATCH EXISTING SHALL DO SO WITH RESPECT TO SIZE, COLOR, TEXTURE, PATTERN, QUALITY AND METHOD OF INSTALLATION INSOFAR AS PRACTICABLE AND SHALL BE APPROVED BY THE EA EACH R RADIU5 3 FLOOD 2 EXIT5 ��
<br />ARCHITECT BEFORE USE: EL ELEVATION RE3 RESILIENT BASE 2ND FLOOR 2 EXITS
<br />22. EXISTING WORK DAMAGED AS A RESULT OF WORK UNDER THIS CONTRACT SHALL BE REPAIRED TO ORIGINAL CONDITION AND FINISHED TO MATCH ADJACENT FINISHES, SUBJECT TO ARCHITECT'S APPROVAL, AT NO ADDITIONAL EL EG ELEGTRIG RFGR REFRIGERATOR 15T FLOOR 2 EXIT5
<br />TAIL PHARMACY I EXIT TO LOBBY rn
<br />COST TO OWNER. ALL REPLACEMENT MATERIAL REQUIRED TO MATCH EXISTING MATERIALS SHALL DO SO WITH RESPECT TO TYPE, PATTERN, TEXTURE, SIZE, SHAPE, COLOR AND METHOD OF INSTALLATION INSOFAR AS ELEV ELEVATION OR ELEVATOR REINF REINFORCEMENT°�
<br />PRACTICABLE, AND SHALL BE APPROVED BY THE ARCHITECT AND OWNER PRIOR TO INSTALLATION. EN ENAMEL RE010 REQUIRED MUNIGIPAL U5E ZONE R-4
<br />23. ALL EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT AND SERVICE DISRUPTED OR REMOVED DURING CONSTRUCTION SHALL BE RESTORED AND REPLACED UNLESS NOTED OTHERWISE. EO EQUAL EXIST EXISTING REV REVER5E OR REVI50N J ,j
<br />Cn
<br />24. INSTALLATIONS OF MECHANICAL, ELECTRICAL AND STRUCTURAL SYSTEMS WILL REQUIRE OPENING OF SOME EXISTING WALLS, CEILINGS, OR FLOOR CAVITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF FF FACTORY FIN15H RM ROOM REQUIRED PARKING
<br />THESE OPENINGS TO MATCH EXISTING, EXCEPT WHERE NOTED OTHERWISE. FILL ALL HOLES AND VOIDS IN FLOORS, WALLS AND CEILINGS WHICH RESULT FROM INSTALLATION OF WORK, AND REMOVAL OF EXISTING MATERIALS FIN FINISH RO ROUGH OPENING 12,411 5.F. / 200 62.055 GAR5 CITY �'�' � S/'. "
<br />AND EQUIPMENT REQUIRED BY THIS CONTRACT. PATCHED AREAS SHALL MATCH THE MATERIALS, FINISHES, AND LEVELS ADJACENT, OR SHALL BE PUT IN THE PROPER CONDITION TO RECEIVE THE FINISH INDICATED. FLR FLOOR �+����'�' EV" T
<br />25. MATERIALS, ARTICLES, DEVICES AND PRODUCTS ARE SPECIFIED IN THE DOCUMENTS BY LISTING ACCEPTABLE MANUFACTURERS OR PRODUCTS, BY REQUIRING COMPLIANCE WITH REFERENCED STANDARDS OR BY PERFORMANCE FLUOR FLUORESCENT 56 LID GO PARKING PROVIDED (92 5PAGE5 C
<br />SPECIFICATIONS. FOR ITEMS SPECIFIED BY NAME, SELECT ANY PRODUCT NAMED. FOR THOSE SPECIFIED BY REFERENCE STANDARD OR BY PERFORMANCE SPECIFICATIONS SELECT ANY PRODUCT MEETING OR EXCEEDING FOIG FURNI5HED BY OWNER SECT SECTION
<br />SPECIFIED CRITERIA. FOR APPROVAL OF AN ITEM NOT SPECIFIED, SUBMIT FOUR (4) COPIES OF COMPLETE BACK-UP INFORMATION FOR PURPOSES OF EVALUATION. WHERE: BUILDING STANDARD ITEMS ARE CALLED FOR, NO INSTALLED BY GONTRACTOR 5HT SHEET LAN05GAPE ON 51TE 5b PROVIDED
<br />SUBSTITUTE WILL BE ACCEPTED. 51M 51MILAR 5.0 GULPED
<br />FTIG FURNISHED
<br />26. CONTRACTOR SHALL PROVIDE FOR ALL WORK REQUIRED TO MAINTAIN COMPLIANCE WITH LOCAL FIRE CODE. PROVIDE FOR ALL REQUIRED SHOP DRAWINGS AND APPROVALS. ET FOOT / FEET 1 5M SHEET METAL
<br />BY TENANT 50 5GUARE
<br />27. CONTRACTOR IS TO PROVIDE DRAWINGS FOR ARCHITECT'S REVIEW SHOWING LOCATIONS OF ALL HVAC THERMOSTATS, GRILLES, AND DIFFUSERS, FIRE AND SMOKE DETECTION DEVICES INCLUDING SPRINKLERS, FIRE EXTINGUISHERS INSTALLED BY GONTRAGTOR 5TD STANDARD- -- ------ T
<br />AND HOSE CABINETS ETC. FURN FURNI5H / FURN15HIN65 5U5P 5U5PENDE® TENANT IMPROVEMENT STATISTICS1
<br />28. ANY CHANGE IN LIGHT FIXTURE PLACEMENT DUE TO INTERFERENCE OF MECHANICAL OR STRUCTURAL COMPONENTS MUST BE APPROVED BY ARCHITECT. GA GAUGE
<br />29. ALL FLOORS SHOULD BE LEVEL AND NOT VARY MORE THAN 1/4" IN 10"-0 THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY CONDITIONS THAT DO NOT MEET THIS STANDARD. GAL V GALVANIZED TELE TELEPHONE -
<br />30. FLOOR FINISH TRANSITIONS SHALL OCCUR UNDER DOORS, UNLESS SHOWN OR NOTED OTHERWISE. 6L 6LA55 / GLAZING TEMP TEMPERED 5GOPE ®F WORK
<br />31. GLAZING IDENTIFICATION LABELS ARE TO REMAIN ON ALL GLAZING UNTIL THE INSULATION INSPECTION IS COMPLETE. 6NO 6YP5UM HALL BOARD THERMO THF-RM05TAT
<br />32. THE CONTRACTOR SHALL VERIFY THE PROPERTY LINES AND SETBACKS FOR THE PLACEMENT OF THE STRUCTURE AUTHORIZED BY THE PERMIT. ALL PROPERTY LINES SHALL BE IDENTIFIED AND STRING LINES PROVIDED AT TIME TYP TYPICAL AREA OF HORK PER THIS PERMIT 15 ON 3RD FLOOR ( SEE SHEET A2.1 FOR OVERALL PLAN ),
<br />OF INSPECTION, HDH HA HARE SCOPE OF THI5 HORK 15 TO DIVIDE EXISTING SUITS 500 IN THO SUITE5:300 AND 301 BY
<br />33. INSPECTOR SHALL MAKE ANY FIELD MODIFICATIONS DEEMED NECESSARY IN ORDER TO MEET MINIMUM BUILDING CODE REQUIREMENTS. HM HOLLOH METAL VAR VARIES BUILDING A DIVIDING HALL AND PROVIDING NEH DOORS FOR NEH 5UITE. NEH SUITE 301 15
<br />34. ANY DEVIATION IN CONSTRUCTION FROM APPROVED PLANS REQUIRES PRIOR REVIEW AND APPROVAL FROM THE CITY.
<br />HGT HEIGHT VGT VINYL GOMPO51TION TILE AREA OF THI5 HORK. IN NEH 5UITE HE PROVIDED HITH 2 NEH RE5TROOM5 AND I
<br />35. PROVIDE WATER STOPS AT ALL COLD JOINTS. HVAG HEATING VENTILATING AIR VEN VENEER BREAK/GONFERENGE ROOM. OTHER AREAS HILL HAVE JU5T G05METIG HORK ( PAINT, Ln
<br />GONPITIONING VRT VERTICAL FLOORING ),In
<br />VHG VINYL HALL COVERING �
<br />IN INGH NO CHANGE OF USE, OCCUPANCY OR FLOOR AREA PER TH15 HORK.
<br />INGAD INLAND 5GEN`i H/ HITH
<br />INGL INCLUDE W/O HITHOUT
<br />IN5UL INSULATION WG HALL COVERING
<br />IN5TL INSTALLATION HO HOOP
<br />CODES LEGAL DESCRIPTION rDE'1r_'_E_RRED SUBMITFALS DRAWING INDEX U1
<br />2OI5 I.B.C. WITH HASHINGT®N STAi AMENDMENTS HAG 51 50 I. HVAG 5Y5TEM 15 DE516NIBUILD DEFERRED SUBMITTAL UNDER SEPARATE PERMIT.
<br />5Y51EM SHALL BE DESIGNED BY A HA5HIN6TON STATE LICENSED ENGINEER. 5Y5TEM 15 DESCRIPTION
<br />� RED, �
<br />TO GONFORM TO REQUIREMENTS OF WA5HIN6TON STATE ENERGY CODE AND SHEET
<br />IGG/AN51 All7.1-200q ACGE551BILITY STANDARDS LOT 2 BLOCK 2b, REPLAT OF BLOCK M-2b, SOUTH PARK ADDITION TO EVERETT INTERNATIONAL ENERGY CONSERVATION GORE. MOUNTING HE1 1T OF CONTROLS SHALL A
<br />A5 PER THE PLAT RECORDED IN VOLUME & OF PLATS, PAGE 5, REGORD5 OF
<br />COMPLY HITH ANSI I17.1®200q FOR AGGE551BILITY, AND SHALL BE LOCATED BETVEEN ARCHITECTURAL �,� �AI.O�s ��,,�;;=O0VESHE���I, . �„ �
<br />CITY OF EVE TT ZONING 5NOHOM15FI COUNTY, HA5HIIN6TON; ALSO, LOTS 21 AND 22, BLOCK 3, CENTRAL 15 AND 44 FROM FIN15H FLOOR, <
<br />PARK ADDITION TO RETT. AI.I � � � EXISTING SITE PLAN I, W
<br />..�
<br />,e 2015 INTERNATIONAL MECHANICAL CODE 4 C 51=52 10.E " _.; ���_ .� a _
<br />2. ELEGTRIGAL SYSTEM 15 DE51GN ILD DEFERRED SUBMITTAL UNDER SEPARATE PERMIT, A2,D DEMO PLAN5
<br />PARCEL ID o 00 2202 iO0 00 5Y5TEM 15 TO CONFORM TO REQUIREMENTS OF THE INTERNATIONAL ELEGTRIGAL. CODE
<br />2015 INTERNATIONAL FUEL GA5 GO®ES (IMF ) WAG 51®52 I
<br />In
<br />AND HASHINGTON STATE AMENDMENTS. SYSTEM SHALL BE DESIGNS® BY A SHINGTON OVERALL PLAN 4 GODE ANALY515
<br />tn
<br />2015 NATIONAL ELECTRIGAL GORE (NEG) STATE LICENSED ENGINEER. MOUNTING HEIGHT OF GONTROL5 AND REGEPTAGLE5 SHALL
<br />GOMPLY HITH AN51 117.1-200q FOR A6GE551BILITY, AND SHALL BE LOCATED BET EN 15" A2.2 FLOOR PLAN I,
<br />2015 INTERNATIONAL FIRE GORE (IFG) $ HAG 51-54A AND 44" FROM FIN15H FLOOR. A3.1 FINISH FLOOR AND CEILING - 5GHEDUL E5
<br />r � A4.1 SECTIONS AND DETAILS
<br />3. ALARM 5Y5TEM 15 DE51GN/BUILD DEFERRED SUBMITTAL UNDER SEPARATE PERMIT.
<br />2015 INTERNATIONAL PLUMBING CODE G 5I-5� 5i 57 THESE DOCUMMENTS HAVE NOT SEEN 5Y5TEM SHALL BE DESIGNED BY A HA5HIN6TON STATE LICENSED ENGINEER. SYSTEM 15
<br />APPROVED FOR `THE 9SSUANC� O TO MEET REQUI MENT5 OF 1 , IFG, NFRAI I3: GOO iNATE IN5PEGTION5 AND FINAL
<br />2015 UNIFORM PLUMBING GORE HAG 51-56 PUBLIC WORK, MECHANICAL, INSPECTION WITH LOCAL JURI5PIGTION FIRE DEPARTMENT.
<br />F'�
<br />SUPPRESSION, LECTRICA� OR
<br />2015 ENERGY GON5ERVATION CODE oil �
<br />PLUNKING PERMITS 4. 5IGNAGE 15 A DEFERRED SUBMITTAL UNDER SEPARATE PERMIT. 51GNAGE SHALL VERET T Fi C;'i. `
<br />���® ��0��i�I'� %��I �I��� Permit 4: �230
<br />CONFORM HITH LOCAL JUR15DIGTION ZONING GORE, LATEST ADOPTED EDITION. Site Address: 4310 COLBY AVE #300&301
<br />"
<br />.2®I SHING_.TON ETA , ENERGY GORES HAG1,-ILO AND 51mlIR �---�-"� - Everett, A 0`I AdditionAl Permit 2015 INTERNATIONAL EXISTING BUILDING COPE, GH.S, GH. LEVEL 2 ALTERATION
<br />Required 5. DOO AND HA A BIDDER-DE5IGNEP. HA HARE GROUPS AND Owner: MATANA IBC
<br />.
<br />DESCRIPTIONS ARE FOR GENERAL OPERATIONAL AND .GOOF COMPLIANCE INFORMATION �� Tenant: PRMC
<br />_ m i ror Th16 Project To InCludea . COORDINATE HITH OWNER FOR A 5PEGIAL 5EGURITY FUN6TION5. SUBMIT GOMPLETE App. Date: 4/2-2/2020
<br />- HARDHARE AND DOOR 5GHEDULE5 HITH PRODUCT GUT 5HEET5 AND MATERIAL 5AMPLE5. Proposed use: COMMERCIAL
<br />PlUmbing Sprinkler OOOR5 AND HAROHARE SHALL GOMPLY HITH IGG-ANI5I17.1-200q. Description: TI- DIVIDE 3RD FLOOR IWO TWO SUITES
<br />x Me0hOrI11081 - Fire Man
<br />ITT OF EIERq TT Reviewed By \ yi
<br />Vie V D 'U .+PEf'iNU T Xciffice set Job Site Set Fire/Planning Set
<br />
|