My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 12/9/2021
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2021
>
Combined Construction Inc. 12/9/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2021 4:05:19 PM
Creation date
12/17/2021 4:05:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
12/9/2021
Council Approval Date
12/8/2021
End Date
12/9/2021
Department
Public Works
Department Project Manager
Gael Fisk/Mike Kangas
Subject / Project Title
Maple Heights Bridge Siesmic Retrofit
Public Works WO Number
PW3693
Tracking Number
0003132
Total Compensation
$566,290.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION <br /> Project: Maple Heights Bridge Seismic Retrofit <br /> Contractor: Combined Construction, Inc. <br /> Work Order No. PW3693 <br /> The above-mentioned project was constructed per the plans and specifications and <br /> to the satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the <br /> contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> Pub is Works Director Date <br /> Ryan Sass <br /> Approved by: <br /> -2/9/Z-1 <br /> r, City of Everett Date <br /> Cassie Fra n <br /> Atte t: kliA/01)1 C,26C-2 <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> David C. Hall, City Attorney <br /> Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.