Laserfiche WebLink
�III� <br />III <br />{ <br />III <br />0 <br />0 <br />0 <br />� <br />� U <br />-a <br />-0 <br />{ <br />{ <br />III{ <br />IIII <br />IIII <br />{{{0 <br />I <br />0 <br />0 <br />0 <br />z <br />�H <br />O" <br />I0 <br />z <br />IIII <br />III <br />0 <br />0 <br />0 <br />{ <br />IJ <br />c no <br />IIII <br />IIII <br />I <br />I0 <br />{: <br />® <br />� <br />O <br />_ <br />0 <br />_� <br />X <br />I <br />0 <br />-0 <br />- <br />I <br />I <br />� I <br />= <br />{ <br />{ <br />PUD POLES <br />BY <br />{ <br />I <br />OTHERS. <br />r <br />i <br />n <br />ui <br />E <br />ca <br />z <br />91 <br />Y <br />ca <br />a <br />Y <br />71 <br />it <br />SCALE <br />! ! 10 20 <br />FEET <br />CONSTRUCTION NOTES: <br />O1 INSTALL INLET PROTECTION PER CITY OF EVERETT <br />STANDARD DWG 210. <br />EROSION CONTROL NOTES: <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES <br />NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN <br />(E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, <br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS <br />THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL <br />CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL <br />BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE <br />CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING <br />LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN <br />CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A <br />MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO <br />NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE <br />WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS <br />NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT <br />AND SEDIMENT —LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY <br />THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, <br />ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS <br />FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO <br />ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND <br />CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING <br />OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE <br />DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE <br />BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE <br />PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL <br />PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE <br />DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM <br />ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR <br />UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH <br />APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH <br />SEPTEMBER 30. <br />GENERAL NOTES: <br />1. ALL EXISTING FEATURE AND APPURTENANCES WITHIN PROPERTY LIMITS <br />TO BE REMOVED INCLUDING ASPHALT, WALL. LANDSCAPING, <br />ILLUMINATION AND STRUCTURES. <br />LEGEND: <br />— — — — — — — — SAWCUT <br />EX CEMENT CONCRETE ASPHALT TO BE REMOVED <br />EX HMA TO BE REMOVED <br />CLEAR AND GRUB <br />REMOVE EXISTING FEATURE <br />8 INLET PROTECTION <br />Know whars below. <br />Gall before you dig. <br />PERTEET <br />2707 COLBY AVENUE, SUITE 900 <br />EVERETT, WA 98201 <br />425.252.7700 1800.615.9900 <br />Permit#: PW1906-061 <br />Site Address: 2721 WETMORE AVE <br />Owner: NORTH COUNTY PROPERTIES LLC <br />Tenant: MARQUEE APARTMENTS <br />App_ date: 6/21/2019 <br />Proposed Use: <br />Description: SITE DEVELOPMENT FOR NEW MARQUEE <br />APARTMENTS <br />Reviewed By.� Date: Ct- <br />fFice Set doh Site Set Fire/Planning Set <br />APR Z 9 2020 <br />CI"T OF <br />Pcrrnit services <br />APPROVED <br />PUBLIC WORO DEPA TMEN <br />BY <br />DATE c, 0 zw2.6 _ <br />CITY OF EVERETT � EVI V b FOR PERMIT <br />y "- <br />�-a` <br />1 FEB 2 0 020 <br />CITY OF EVERETT <br />Permit ServiCes <br />ABUS STOP SIGN RELOCATION 9/25/19 <br />NO. DESCRIPTION DATE <br />REVISIONS <br />PROJECT NO: 20180241 <br />DATE: 02/2019 <br />DRAWN BY: MC <br />APPROVAL: MRM <br />Marquee <br />Apartments <br />2721 Wetmore Ave <br />Everett, WA <br />Demo & Site <br />Preparation <br />Plan <br />DESIGN DEVELOPMENT <br />PHASE <br />SHEET NO: <br />C1.0 <br />o�i <br />