My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3143
>
Ordinances
>
Ordinance 3143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 2:05:50 PM
Creation date
7/15/2022 2:05:35 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3143
Date
8/26/1947
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 t 4 <br /> • <br /> ORDINANCE NO. 3143 • <br /> AN ORDINANCE providing for the improvement of 34th Street <br /> from Snohomish Avenue to Kromer Avenue , Bell Avenue from 34th Street <br /> to 35th Street , Tulalip Avenue from 33rd Street to 34th Street , <br /> Niles Avenue from Laurel Drive to Tulalip Avenue , and Kromer Avenue <br /> from 33rd Street to 35th Street , by the construction of a Portland <br /> cement concrete pavement, necessary sidewalks, installation of <br /> necessary water mains , and by doing all other work necessary to <br /> make a complete improvement , all in accordance with Resolution <br /> No. 5230 of the City of Everett ; creating a local improvement <br /> district ; creating a local improvement district fund therefor; pro- <br /> viding that fifty per cent ( 50%) of the cost of that portion of <br /> the improvement involving grading , construction of surfacing and <br /> pavement and engineering expense shall be paid b the funds from <br /> the Washington State Development Board, and the balance of the cost <br /> of said improvement shall be borne by and assessed against the <br /> property liable therefor in said district under the mode of pay- <br /> ment by bonds. <br /> WHEREAS, by Resolution No. 5230 the City Council of the <br /> City of Everett has declared its intention to order the improve- <br /> ment as above outlined, and doing all work in connection therewith <br /> to make a complete improvement in accordance with the plans and <br /> specifications as prepared by the City Engineer of the City of <br /> Everett . <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: That 34th Street from Snohomish Avenue to <br /> Kromer Avenue , Bell Avenue from 34th Street to 35th Street, Tulalip <br /> Avenue from 33rd Street to 34th Street, Niles Avenue from Laurel <br /> Drive to Tulalip Avenue , and Kromer Avenue from 33rd Street to <br /> 35th Street be paved with Portland cement concrete pavement and <br /> including as a part of such work the construction of necessary <br /> sidewalks , installation of necessary water mains , and by doing all <br /> other work necessary to make a complete improvement , all in ac- <br /> cordance with the plans and specifications prepared under the <br /> directionof the City Engineer and rich plans and specifications <br /> are hereby adopted and approved. <br /> Section 2 : That the cost and expense of such improve- <br /> ment including all necessary and incidental expenses , shall be <br /> borne as follows: <br /> Fifty per cent ( 50%) of the cost of that portion of <br /> the improvement involving grading, construction of surfacing and <br /> pavement and engineering expense shall be paid by funds from the <br /> Washington State Development Board, the remaining cost of said <br /> improvement shall be borne by and assessed against the property <br /> liable therefor in the district herein created in accordance with <br /> law. <br /> The City of Everett shall not be liable in any manner <br /> for any portion of the costs and expenses of such improvement <br /> except as provided by Chapter 141 Session Laws of 1923 , or acts <br /> amendatory thereto and the ordinances of the City of Everett . <br /> - 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.