GENERAL REQUIREMENTS
<br />SUMMARY OF WORK
<br />Project consists of cast in place concrete detention vault as shown on these Contract Documents used in
<br />coordination with the Civil and other discipline's documents.
<br />GOVERNING CODE
<br />All design and construction shall conform to the 2018 International Building Code, ACI 350-06, and local
<br />jurisdiction amendments.
<br />Reference tuASTMand other standards shall refer tothe latest edition designated hvIBC Chapter 35.
<br />Refer to the specifications for information in addition to that covered by these structural notes and
<br />drawings.
<br />DOCUMENT
<br />Structural Documents shall beused inconjunction with Architectural CwcumentsforaUbiddingand
<br />construction.
<br />Drawings indicate general and typical details ofconstruction. Typical details and general notes shall apply
<br />even ifnot specifically denoted on plans, UN0.Where conditions are not specifically indicated similar
<br />details of' construction shall be used, subject to review and approval by the Architect and the SER.
<br />These Contract Documents and any materials used inpreparation ofthem, including calculations, are the
<br />exclusive property of the SER and can be reproduced only with the permission of the SER.
<br />WARRANTY
<br />The SER has used that degree of care and skill ordinarily exercised under similar circumstances by
<br />members of the profession in this locale and no other warranty, either expressed or implied, is made in
<br />connection with rendering professional services.
<br />OWNER RESPONSIBILITY
<br />The owner shall retain a Special Inspector to perform the special inspection requirements required by the
<br />building official and asoutlined inthe Special Inspection section below.
<br />..LAASH k wheel loads:
<br />Citv of Everett larae Vactor truck wheel loads:
<br />re
<br />|
<br />1
<br />®R
<br />I
<br />City of Everett standard Vactor truck wheel loads:
<br />City of Everett standard Fire truck wheel loads:
<br />�
<br />'
<br />�
<br />LIVE LOADS-SMOVU
<br />Numbering below isper IBC Section 16O31]:
<br />4' 7^
<br />| 4' 8^ |
<br />1. Flat -Roof Snow Load:
<br />Pf
<br />=126psf
<br />I Snow Exposure Factor:
<br />C°
<br />= 1.0
<br />I Snow Importance Factor:
<br />Is
<br />=11
<br />4. Thermal Factor:
<br />[/
<br />= 1.0
<br />Additional Items:
<br />Ground Snow Load:
<br />90
<br />= 15ps
<br />Minimum uniform roof snow load
<br />= 25 psf
<br />FRONT AXLE: 8,00OLBS
<br />REAR AXLE #1:32,0O0L0S
<br />FRONT AXLE: 18,R0UB
<br />REAR AXLE #1:22,875U8S
<br />REAR AXLE #2:22,O75LBI
<br />REAR AXLE #]:22,875L0S
<br />REAR AXLE #4:22,875L0S
<br />FRONT AXLE: 16798LDS
<br />REAR AXLE #1:3l,665L8l
<br />REAR AXLE #2:2l665LBS
<br />FRONT AXLE: 19,000LBI
<br />REAR AXLE #1:24,088LB3
<br />REAR AXLE #Z: 24,000LBS
<br />LATERAL LOADS ' EARTHQUAKE
<br />Numbering below isper IBC Section 16031.5:
<br />1.Risk Category: U
<br />2. Seismic Importance Factor: |, = 1.0
<br />3.K4apped Spectral Response Acceleration Parameters: S, = 1.394g; S, = 8I29 g
<br />4.Site Class: D; FA = 1.0C Fv = 1.5
<br />5.Design Spectral Response Acceleration Parameters: Sns = 0L929g; Sm = 0.528g
<br />6. Seismic Design Category: D
<br />7.Seismic Response Coefficient: [s=8194
<br />8.Reoponse Modification Coefficient: Fh = l[; Rc = 1.0
<br />9. Analysis Procedure: Seismic Design of Liquid -Containing Concrete Structures, ACI 350.3-06
<br />DESIGN DOCUMENTS
<br />Contractor shall verify all dimensions and all conditions at the job site, including building and site conditions
<br />before commencing work, and be responsible for same. All discrepancies shall be reported to the Architect
<br />before proceeding with work. Any errors, ambiguities and/or omissions in the contract documents shall be
<br />reported to the Architect immediately, in writing. No work is to be started before correction is made.
<br />Contractor shall verify and/or coordinate all dimensioned openings and slab edges shown on the contract
<br />documents. Some dimensions, openings and embedded items are shown on the structural drawings. Others
<br />may be required. Refer to architectural drawings for size and location of curbs, equipment pads, wall and floor
<br />openings, architectural treatment, embeds required for architectural items and dimensions. Refer to mechanical,
<br />plumbing, electrical and five protection drawings for size and location of all openings for ducts, piping. conduits'
<br />etc. Submit openings to Architect for review.
<br />Donot scale drawings. Use only field verified dimensions. When electronic plan files are provided for the
<br />Contractor's detailing convenience, it shall be noted that the electronic files are not guaranteed to be
<br />dimensionally accurate. The Contractor uses them at their own risk. The published paper documents are the
<br />controlling Contract Documents. Electronic files of detail sheets and notes will not be provided.
<br />CONTRACTOR- INITIATED CHANGES
<br />Contractor- initiated changes shall be submitted in writing to the Architect for review and acceptance prior to
<br />fabrication or construction. Changes shown on shop drawings only will not satisfy this requirement.
<br />INSPECTIONS
<br />The Contractor shall coordinate with the building department for all building department required inspections.
<br />TEMPORARY SHORING AND BRACING
<br />The Contractor shall provide temporary bracing as required until all permanent connections and stiffening have
<br />been installed. The Contractor is responsible for the strength and stability ofall partially completed structures
<br />including but not limited to concrete or masonry walls, steel framing and erection aids. The Contractor shall, at
<br />their discretion, employ the aid of a licensed Structural Engineer to design all temporary bracing and shoring
<br />necessary to complete the work described in these contract documents. The Contractor shall be responsible for
<br />all required safety standards, safety precautions and the methods, techniques, sequences or procedures
<br />uired in performing their work. For concrete construction refer to ACI 318 Section 2611.2"Removal of
<br />Formwork".
<br />SAFETY PROCEDURES
<br />Contractor shall beresponsible for all safety precautions and the methods, techniques, sequences or
<br />procedures required to perform the contractor's work. The Structural Engineer has no overall supervisory
<br />authority or actual and/or direct responsibility for the specific working conditions at the site and/or for any
<br />hazards resulting from the actions ofany trade contractor. The Structural Engineer has no duty to inspect
<br />supervise, note' correct, or report any health orsafety deficiencies to the Owner, Contractors, mrother entities
<br />orpersons atthe project site.
<br />SHOP DRAWINGS AND SUBMITTALS
<br />SHOP DRAWING & SUBMITTAL REVIEW (including Deferred Structural Components)
<br />The contractor must review and stamp the shop drawings & submittals for review. SIR will only review
<br />submittals for items shown on SEKdocumentx. Submittals for Deferred Structural Components will receive
<br />cursory review bvSERfor loads imposed onprimary structure. SEkwill review shop drawings for general
<br />conformance with design concept of the project and general compliance with the information given in the
<br />Structural Contract Documents. Review of submittals does not constitute approval or acceptance of
<br />unauthorized deviation from Contract Documents.
<br />Corrections or comments made on shop drawings during this review do not relieve Contractor from
<br />compliance with the requirements ofthe plans and specifications.
<br />Contractor responsible for:
<br />~ Reviewing, approving, stamping and signing submittals prior to submittal to Architect and SER
<br />" Timing submittals to allow two weeks of review time for the SER and time for corrections and/or
<br />reoubmitta|
<br />~ Conformance 0urequirements ofthe Contract Documents
<br />~ Dimensions and quantities
<br />~ Verifying information to be confirmed or coordinated
<br />^ Information solely for fabrication, safety, means, methods, techniques and sequences of construction
<br />~ Coordination of all trades
<br />`
<br />Resubmittals shall be clouded and dated for all changes to the submittal. Only clouded portions of
<br />nsubmitt |viUberevewedandSER'srevewstompapp|kestounlytheseaneas.
<br />SUBSTITUTIONS
<br />Substitutions shall be submitted in writing prior to submittal of shop drawings. Shop drawings bearing
<br />substitutions will berejected. Submit engineering data tosubstantiate the equivalence ofthe proposed
<br />items. The SER's basic services contract does not include review of substitutions that require re-
<br />engineerinci of the item or adjacent structure. Nor does the SER's contract cover excessive review of
<br />proposed substitutions. The fees for making these reviews and/or redesign shall be paid by the
<br />Contractor. Reviews and approvals shall not be made until authorization is received.
<br />SUBMITTALS
<br />Shop drawings and material submittals shaUbesubmittedtotheAohbec and SERprior tnany fabrication
<br />or construction for the following structural items. Submittals shall include one reproducible and one copy;
<br />reproducible will be marked and returned. If deviations, discrepancies, or conflicts between shop drawings
<br />submittals and the contract documents are discovered either prior to or after shop drawing submittals are
<br />processed bvthe SER.the Contract Documents control and shall befollowed.
<br />, Construction sequence description
<br />~ Contractor quality control testing procedures when required in specifications
<br />° Concrete mix designs
<br />~ Concrete construction joint plans
<br />~ Concrete accessories material specification, size and location
<br />~ Reinforcing bar shop drawings and placing plans
<br />° Reinforcing bar mill certificates shall beavailable upon request
<br />~ Deferred Structural Components listed below
<br />DEFERRED STRUCTURAL COMPONENTS
<br />Components referred to as Deferred Structural Components shall comply with these notes. These
<br />elements have not been permitted under the base building application. The Contractor will be required to
<br />submit the component system documents to the building official for approval. The documents shall be
<br />stamped and signed byanengineer licensed bythe state where the project is|ocated.Thedefened
<br />structural components shall not be installed until the design and submittal documents have been
<br />approved bythe building official.
<br />Prior to building department submittal, the deferred structural components submittals shall receive
<br />cursory review by SER for loads imposed on primary structure and general conformance with design
<br />concept of the project and general compliance with the information given in the Structural Contract
<br />Documents. Review of submittals does not constitute approval or acceptance of unauthorized deviation
<br />from Contract Documents. Submittals of contractor -designed components shall include the designing
<br />professional engineer's stamp and signature, as noted above. The submittal shall be approved by the
<br />component vendor prior to review by the SER. The designing professional isresponsible for code
<br />conformance and all necessary connections not specifically called out on architectural or structural
<br />contract documents.
<br />Submittals shall include details of connections to primary structure that indicate magnitude and direction
<br />ofall loads imposed atpoint ofconnection. Design criteria shall beprovided with submittal and
<br />calculations shall bemade available upon request.
<br />The following list includes the items that are defined as Deferred Structural Components. Refer to other
<br />discipline's contract documents for additional deferred components that may require structural design
<br />and details. Connections of these elements shall not induce torsion on structural members. Deferred
<br />Structural Components shall be manufactured, delivered, handled, stored' and field erected in
<br />conformance with instructions prepared bythe component vendor.
<br />Deferred structural components:
<br />° Helical anchors
<br />INSPECTIONS BY BUILDING OFFICIAL
<br />The building official, upon notification, shall make structural inspections as required by local ordinance.
<br />The inspection by the building official per IBC Section 110 will be separate from and in addition to the
<br />special inspection and structural observation mentioned subsequently.
<br />SPECIAL INSPECTIONS
<br />ASpeda| Inspector shall be hired by the owner to perform the following special inspections per |B[
<br />Section 1704. See the specifications for additional requirements for special inspection and testing. The
<br />architect, structural engineer, and building department shall be furnished with copiesofaUinspecbun
<br />reports and test results.
<br />Each contractor responsible for the construction of seismic force resisting system, designated seismic
<br />system, or component listed in the statement of special inspections shall submit a written statement of
<br />responsibility tuthe building official and the owner prior tothe commencement of work on the system or
<br />component. The written statement shall beinaccordance with IBC Section 17O4.4.
<br />See IBC Chapter 17: "Special Inspections and Tests" for more detailed requirements.
<br />d1lifflW" 21 1 .11 JAI Pill
<br />Frequency
<br />Verification and Inspection
<br />Reference
<br />Cont. Periodic
<br />Verify element materials, sizes, and lengths to comply with the
<br />X
<br />requirements
<br />Determine capacities of test elements and conduct additional load
<br />X
<br />tests, as required
<br />Observe driving operations and maintain complete and accurate
<br />X
<br />records for each element
<br />Verify placement locations and plumpness, confirm type and size of
<br />X
<br />hammer, record number of blows per foot of penetration, determine
<br />required penetrations to achieve design capacity, record tip and butt
<br />elevations and document any damage to foundation element
<br />For specialty elements: perform additional inspections as determined
<br />by the registered design professional in responsible charge
<br />Verification and Inspection Reference
<br />Cont. Periodic
<br />Verify materials below shallow foundations are adequate to achieve X77
<br />the design bearing capacity
<br />Verify that excavations are extended to proper depth and have X
<br />reached proper material
<br />Perform classification and testing of compacted fill materials X
<br />Verify use of proper materials, densities and lift thicknesses during X
<br />placement and compaction of compacted fill
<br />Prior to placement of compacted fill, observe subgracle and verify that
<br />site has been prepared properly
<br />Frequency
<br />Verification and Inspection
<br />Reference
<br />Cont.
<br />Periodic
<br />Inspect reinforcement, including prestressing tendons, and verify
<br />X
<br />IBC 1908.4
<br />Reinforcing bar welding:
<br />- Verify weldability of reinforcing bars other than ASTM A706
<br />X
<br />AWS D1.4
<br />- Inspect single -pass fillet welds, maximum 5/16"
<br />X
<br />ACI 318:26.6.4
<br />- Inspect all other welds
<br />X
<br />Verifying use of required design mix
<br />X
<br />IBC 1904.1,
<br />1904.2,1908.2-3,
<br />Prior to concrete placement, fabricate specimens for strength tests,
<br />X
<br />IBC 1908.10
<br />perform slump and air content tests, and determine the temperature of
<br />ACI 318:26.4,
<br />the concrete
<br />26.12
<br />inspection of concrete and shotcrete placement for proper application
<br />X
<br />IBC 1908.6-8
<br />Verify maintenance of specified curing temperature and techniques
<br />X
<br />IBC 1908.9
<br />Inspect formwork for shape, location and dimensions of the concrete
<br />X
<br />ACI 318:
<br />being formed
<br />26.11.1.2(b)
<br />REPORT & GENERAL CRITERIA
<br />Criteria outlined in the report listed below was used for the design of the foundations:
<br />Geotezhnico/Engineering Rl
<br />prepared byTerraconConsultants, Inc. (yWay15'2O20
<br />Contractor shall be familiar with recommendations in the above -mentioned report prior to start of
<br />construction. Allowable soil pressure and lateral earth pressure are assumed and therefore must be
<br />verified by Geubechnica| Inspector or the building official. |fsoils are found to beother than
<br />assumed' notify the Structural Engineer for possible foundation redesign. For wet weather work, see
<br />the Geotechnica|Report.
<br />Unless noted otherwise, footings shall becentered below columns orwalls.
<br />INSPECTIONS
<br />All prepared soil -bearing surfaces shall be inspected by the owners Geotechnical Inspector (or
<br />building uffida|) prior to placement ofreinforcing steel and concrete. Inspections shall be made per
<br />IBC Table 17056.
<br />BEARING VALUES
<br />All footings shall bear on undisturbed soil and shall be lowered to firm bearing if suitable soil is not
<br />found atelevations shown. Exterior footings shall bear aminimum of18^below the finished ground
<br />surface. Footing elevations shown on plans (or in details) are minimum depths and for guidance only;
<br />the actual elevations of footings must be established by the Contractor in the field working with the
<br />Geotechnica||nxpecor.
<br />Allowable vertical bearing soil pressure = 2,000 psf
<br />SU0GRADE PREPARATION
<br />Prepare subgrade per the Geotechnical Report, summarized as follows: All footings shall be cast on undisturbed
<br />firm natural soils that are free of organic materials. Footing excavation shall be free of loose soils, sloughs, debris
<br />and free ofwater utaUtimes. If organic silt and/or fill material is encountered at subgrade elevations, overexcavate
<br />a minimum of Z-O" below the design foundation subgracle elevation prior to placing footings. Theovmrexcavated
<br />areas shall be beckOUed with structural 0| compacted to 95% proctor perASTk4 D-1557 or a lean concrete mix.
<br />EXISTING UTILITIES
<br />The Contractor shall determine the location of all adjacent underground utilities prior to any excavation, shoring.
<br />pile driving, orpier drilling. Any utility information shown on the plans and details are approximate and not
<br />verified by the SER. Contractor is to provide protection of any utilities or underground structures during
<br />construction.
<br />DRAINAGE
<br />Drainage systems, including foundation, roof and surface drains, shall be installed as directed by the Geotechnical
<br />Report. Vapor retarder placed below slab -on -grade shall conform to ASTM E 1643 and ASTM E 745.
<br />RETAINING WALLS/BASEMENT WALLS
<br />Grade nneither side ofconcrete walls shall not vary bymore than 12^'UNO. Slope ofbackfi||shall not exceed 2H
<br />to 1\( UNO. 8ackfi|| behind all retaining walls with free draining' granular fill installed per the Gootechnica| Report.
<br />Design pressures used for the design ofretaining walls are based on fully submerged conditions.
<br />Active earth pressure = 80PCF
<br />A1'restearth pressure = 90P[F
<br />Passive earth pressure = 280P[F
<br />Coefficient offriction (factor ofsafety of1.S included) =0.45
<br />Provide temporary shoring for tops of walls if backfill is placed prior to the supporting structure being constructed.
<br />Supporting structure is the floor framing and sheathing completely installed and attached to perpendicular walls.
<br />PILES AND PIERS GENERAL CRITERIA
<br />Pile orpier lengths indicated ondrawings are estimated; actual length shall be determined infield byGeotechnica|
<br />Inspector. For bidding purposes, the contractor shall provide an add/deduct value per foot of pile/pier length.
<br />This value shall be applied to variations in actual lengths as compared to estimated lengths.
<br />The contractor shall determine the location ofall adiacentundorgroundutilities prior todrilling ordriving
<br />operations. Hole drilling shall beperformed vvithou�loss ofground and without endangering previously installed
<br />piles. Refer to the Geotechnica| Report for recommended drilling or driving procedure. Alternate piles shall be
<br />placed and completed so that at least 24 hours are allowed for the concrete to set prior to drilling adjacent piers.
<br />Pile or pier types other than those indicated on the drawings may be submitted as a Substitution. Optional piles
<br />must be supported on the same soil strata as the piles shown on the drawings. If the configuration of the piles is
<br />different from the contract documents, the modification to the pile caps must also be designed by the contractor
<br />and submitted with the Substitution. A2-weekminimum time allowance must bemade for the engineer toreview
<br />all optional pile and pile -cap design.
<br />Inspections shall be made by the Geotechnica| Inspector per IBC Table 17057or 1705.8.
<br />HELICAL PILES
<br />Helical Piles shall conform to geotechnical report recommendations for minimum required loads shown on plans.
<br />Helical Piles shall meet the following criteria:
<br />Minimum Depth 10ft below base of foundation
<br />Installation Criteria 5'000ft'|b minimum torque
<br />Testing Criteria (2)anchors to20096ofdesign load
<br />Special Inspections Per IBC 1705.9
<br />CONCRETE
<br />CAST -UN -PLACE CONCRETE
<br />Concrete materials shall conform to the following:
<br />Portland cement:
<br />Type 1'ASTM[1S0
<br />Fly ash (if used):
<br />A5TK4 [618dass For[
<br />Slag cement (if used):
<br />ASTK4[989
<br />Lightweight aggregates:
<br />lightweight aggregates shall not beused without
<br />prior approval ofSEKand building department
<br />Normal weight aggregates:
<br />A5TW[33
<br />Sand equivalent:
<br />ASTM[33
<br />Water:
<br />Potable per ASTM C94
<br />Air entraining admixtures:
<br />ASTK4 [260
<br />Chemical admixtures:
<br />A6TWC4O4
<br />Floweb|oconcrete admixtures:
<br />ASTK4[lO17
<br />Durability requirements ofconcrete mixes shall conform tobuilding code. These requirements include
<br />water'cemenddou» material ratios' minimum compressive strengths, air entrainment type of cement, and
<br />maximum chloride ion content.
<br />Strength MaxMaxTotal Air and Classes
<br />Location Vc
<br />| |Agg Size | VVyC! Content(PEI) Ratio
<br />| | � T
<br />F S
<br />LEAN MIX SOIL REPLACEMENT 1.5 SACK
<br />UNDER FOUNDATIONS 1,500 SAND CEMENT F2 SO WO C1
<br />CONCRETE MIXTURES
<br />Mixes shall be proportioned to meet compliance requirements of ACI 350 Section 5.2. Slump, Vy/[ratio,
<br />admixtures and aggregate size will bedetermined bythe contractor. Submit documentation ofconcrete
<br />mixture characteristics for review by the SER before the mixture is used and before making changes to
<br />mixtures already in use. Documentation shall comply with AC| 350Sedion 5.3.3.
<br />All concrete, including slab on grade, shall contain an acceptable water -reducing admixture conforming to
<br />ASTM C494 and be used in strict accordance with the manufacturer's recommendations.
<br />All concrete which is exposed to freezing and thawing in a moist condition or exposed to deicing
<br />chemicals shall contain anair entraining agent, conforming toASTK4[26O. Total air content shall be
<br />adjusted per A[|]5Ufor mix designs with smaller nominal aggregate size. The amount ofentrained air
<br />shall bemeasured atthe discharge end ofthe placing nozzle. Entrained air shall beasnoted ±1.0Y6by
<br />volume. Air -entrainment shall not be used at slabs that will receive a smooth, dense, hard -troweled finish.
<br />Trucks hauling plant -mixed concrete shall arrive on -site with a field ticket indicating the maximum gallons
<br />of water that can be added at the site not to exceed the total water content in the approved mix design.
<br />Concrete shall be deposited as nearly as practicable in its final position to avoid segregation due to
<br />rehandling orflowing. Concrete shall be thoroughly consolidated by suitable means during placement
<br />and shall be thoroughly worked around reinforcement, embedded items, and into corners of forms.
<br />��`
<br />Pmmit� P�2�7�� ���
<br />Site Address: 2200LYMP|C8;VO
<br />|
<br />Owner: CAT A[YSTCAPOFAL
<br />Tenant: VAOUTPATIENT CLINIC
<br />App.Date: 7/22-/I020
<br />Proposed Use: DEMO
<br />Description: BTORK0VVATERuKU[TFOR NEVVVA
<br />OUTPATIENT CUW|C-REVISION ARI0ISSUANCE
<br />Reviewed
<br />7,�Qffice set Job Site Set Fire/Planning Set
<br />190NvW^zEEaTPEETSUITE oo| osNVsRooLORxou8nuo2
<br />11 - - , 1� I F�" N Di"
<br />ffl, I g
<br />Ali NOW
<br />Sv F, H`11,1
<br />M_
<br />}2OlFirst Avenue South, Suite 310
<br />Seattle, Washington 98134
<br />ISSUANCE: DATE:
<br />PERMIT SET 05/26/2021
<br />APPROVED
<br />PUBLIC WORKS DEPARTMENT
<br />By
<br />DATE
<br />CITY OF EVERETT REVIEWED FOR PERMIT
<br />SHEET NUMBER: