My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2118 VIRGINIA AVE 2025-08-07
>
Address Records
>
VIRGINIA AVE
>
2118
>
2118 VIRGINIA AVE 2025-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 10:42:34 AM
Creation date
10/20/2023 11:12:19 AM
Metadata
Fields
Template:
Address Document
Street Name
VIRGINIA AVE
Street Number
2118
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2008-025 Description: REPLACE CANOPY THAT WAS DESTROYED BY SNOW FEB <br /> 2019 <br /> Applied:8/14/2020 Approved: 6/25/2021 Site Address: 2118 VIRGINIA AVE <br /> Issued:6/28/2021 Finaled: City,State Zip Code: EVERETT,WA <br /> Status:ARCHIVED-NOT FINALED Applicant: ROBERT GILDROY <br /> Parent Permit: Owner:GILDROY ROBERT A&VIVIAN J <br /> Parent Project: REVI21-008 Contractor: OWNER <br /> Details: <br /> **REASONABLE ACCOMODATION REQUEST FOR REDUCED SIDE SETBACK APPROVED VIA REVI21-008** <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 12/14/2021 12/14/2021 BLDG 02- KURT KECK APPROVAL <br /> FOOTING/SETBACK <br /> Notes: <br /> Site contact:Robert Gildroy 425-259-1637 <br /> 6/13/2022 6/13/2022 PERMIT EXTENSION Permit Technician EXTENSION <br /> (Reason Required) APPROVED <br /> Notes: <br /> NEEDED EXTENSION <br /> 6/14/2022 6/14/2022 BLDG 02- KURT KECK APPROVAL <br /> FOOTING/SETBACK <br /> Notes: <br /> Early morning inspection requested <br /> Chris Anderson 425-922-2066 <br /> PERMIT EXTENSION EXTENSION <br /> 12/22/2022 12/22/2022 (REASON CINDY BERGSMA APPROVED SEE NOTES <br /> REQUIRED) <br /> Notes: <br /> I so appreciate your understanding.The work has taken longer than planned,but we're on the final approach and pressing to complete things in <br /> Jan/Feb if we can take advantage of the few good weathers days we'll have in that period. <br /> Thanks for helping us help the Gildroy's! <br /> Chris <br /> I <br /> Printed: Friday, 20 October, 2023 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.