My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders 4/5/2024 Amendment 2
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders 4/5/2024 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 8:25:55 AM
Creation date
4/5/2024 8:25:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders
Approval Date
4/5/2024
Council Approval Date
3/20/2024
End Date
12/31/2025
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB-PW Tenant Improvements Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003791
Total Compensation
$24,753,258.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BNBuilders Inc. 6/14/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
AIA Document A133™– 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. <br />The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used <br />without permission. This draft was produced by AIA software at 14:22:51 ET on 09/16/2022 under Order No.2114304515 which expires on <br />03/23/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents ® Terms <br />of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes:(1131696201) <br /> <br />1 <br />AIA® Document A133™ – 2019 <br />Exhibit A <br />Guaranteed Maximum Price Amendment <br />This Amendment dated as of the date of last signature below, is incorporated into the accompanying AIA Document <br />A133™–2019r1, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the <br />basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the 13th day of June in <br />the year 2023 (the “Agreement”). <br />(In words, indicate day, month, and year.) <br />for the following PROJECT: <br />(Name and address or location) <br />Everett Municipal Building – Public Works Tenant Improvements <br />THE OWNER: <br />(Name, legal status, and address) <br />The City of Everett <br />Parks & Facilities Dept. <br />802 E. Mukilteo Blvd., Suite 100 <br />Everett, WA 98203 <br />THE CONSTRUCTION MANAGER: <br />(Name, legal status, and address) <br />BN Builders, Inc. <br />2601 4th Ave. #350 <br />Seattle, WA 98121 <br />TABLE OF ARTICLES <br />A.1 GUARANTEED MAXIMUM PRICE <br />A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />A.3 INFORMATION UPON WHICH AMENDMENT IS BASED <br />A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS
The URL can be used to link to this page
Your browser does not support the video tag.