My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2272
>
Ordinances
>
Ordinance 2272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2024 11:25:03 AM
Creation date
4/12/2024 11:24:57 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2272
Date
6/22/1926
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
411 <br /> ORDINANCE NO. 2272 <br /> An Ordinance providing for the improvement of Chestnut <br /> Street, 24th Street to Everett Avenue, by grading to proper <br /> grade, removal of old lumber, construction of concrete curbs, <br /> construction of one course 6-inch Portland cement concrete pve- <br /> ment 24 feet wide, installation of necessary drainage, making <br /> necessary water main changes, and doing all other work on the en- <br /> tire district necessary to make a complete Improvement , all in <br /> accordance with Resolution No. 3254 of the City of Everett; creat- <br /> ing an assessment district; creating a Local Improvement Dis- <br /> trict fund therefor, providing that said improvement be made by <br /> special assessment upon the property in said district under the <br /> mode of payment by bonds. <br /> WHEREAS, by Resolution No. 3254 of the City of Everett, <br /> the City Council of Everett has declared its intention to order <br /> the improvement as above outlined and doing all other work ne- <br /> cessary in connection therewith to make a complete improvement in <br /> accordance with plans and specifications prepared by the City <br /> Engineer; now, therefore, <br /> THE CITY OF EIERT:TT DOES ORDAIN: <br /> Section 1: That Chestnut Street, from 24th Street to Ev- <br /> erett Avenue, be improved by grading to proper grade, removal of <br /> old lumber, construction of concrete curbs, construction of one <br /> course 6-inch Portland cement concrete pavement 24 feet wide, in- <br /> stallation of necessary drainage, making necessary water main <br /> changes and doing all other work on the entire district necessary <br /> to make a complete improvement according to the plans and spec- <br /> ifications, prepared under the direction of the City Engineer, <br /> which plans and specifications are hereby adopted and approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.