Laserfiche WebLink
• <br /> I <br /> ORDI1 &1 OB NO. 2216 • <br /> An ordinance providing for the improvement of Pacific Avenue, <br /> from Broadway, to Pine by grading to, proper grade, removal of, old <br /> lumber, _r? of necessary drainage, mad-making necessary <br /> water main changes, also by construction of 'tWo, let strips of either <br /> 6" Portland Cement oonotriction pavement or 5" asphaltic oonotrnon <br /> pavement,and construction of a sidewalk from Broadway to McD*ugall <br /> and from Cedar to Fulton on the. Xerth side; also McDougall from Pacific <br /> to south end of Milwaukee loading platform in Block; 761. Smith <br /> Avenue from Wall to Paine; Paine from Smith to 33rd, 33rd. from Paine <br /> to Smith; Smith from 33rd to 34th, and 32nd -from McDougall to Paine <br /> by removal of old lumber, grading construction of either 6" rortland <br /> cement pavemen fir. a..5" asphaltic Concrete pavement 18' wi4e,; just- <br /> lat1on of necessary drainage, etc., Also Hill Street, from the <br /> present concrete pavement in front of the Standard Oil Co' s property <br /> on Hill Street, South to the North line of Lot 14, Block 746, by <br /> grading to proper grade and doing all other work necessary to make <br /> a complete improvement, all in accordance with Resolution To. 3165 <br /> of the City of Everette creating . an assessment district; creating a <br /> local-"improvement district 'fund therefor, providingthat said tmprove- <br /> , <br /> mentlete made by special asseamment''upon the property in said district <br /> under the mode of payment by bonds. <br /> Whereas, by resolution No. 5165 of the 'City of Everett, the <br /> city council of Everett has declared its intention to order the im- <br /> provement as above = outlined and doing all other work necessary: i <br /> connection therewith to make a complete impravemerit in accordance <br /> with plans and specifications prepared by the city en:ineer; now <br /> theretire, <br /> THE CITY OP EVVER 'T DOZS ORDAIN: <br /> Section 1. That Pacific Avenue, from Broadway to Pine be- <br /> improved by grading to : proper grade, removal of old lumber, i� �� � ti <br /> tu-ien of necessary drainage, and making necessary water main changes, <br /> , also by construction of two 18' strips of either 6" Portland Cement <br /> -1- <br />