My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2181
>
Ordinances
>
Ordinance 2181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 3:13:26 PM
Creation date
6/7/2024 3:13:22 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2181
Date
12/9/1924
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO 2181 . <br /> An Ordinance providing for the improvement of the alley <br /> between 25th and 26th Streets and Rucker and Grand Avenues, by <br /> rading to proper grade, and construction of a 5 inch concrete <br /> pavement, 18 feet wide, installation of necessary drainage and <br /> doing all other work necessary in connection therewith to make <br /> a oomplete improvement, creating an assessment district, creating <br /> a Local Improvement District Fund therefor and providing that <br /> payment for said improvement be made by special assessments on <br /> the property in said district under the mode of payment by bonds, <br /> Whereas, a majority petition of the property owners <br /> petitioning for said improvement, has heretofore been filed with <br /> the Commissioner of Public Works and said Commissioner has found <br /> the things set forth in said petition to be true, and, <br /> Whereas,, said Commissioner of Public Works has filed with <br /> the City Council all data and information, as required by law, and, <br /> Whereas, said. Commissioner of Public Works has recommended <br /> to the City Council that said improvement petitioned for be made, and <br /> it appearing to the: City Council that public gonvenience and necessity <br /> requires such improvement to be made, now therefore, <br /> THE CITY OF EVERETT DOES ORDAIN : <br /> Section 1 : That the alley between 25th and 26th Streets <br /> and Rucker and Grand Avenues be improved by grading to p oiler trade, <br /> and construction of a 5 inch concrete pavement, 18 feet wide, <br /> installation of necessary drainage and doing all other work necessary <br /> in connection therewith to make a complete improvement, according <br /> to the plans and specifications, prepared under the direction of <br /> the City Engineer, which plans and specifications are hereby adopted <br /> and aboroved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.