Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 12/12/2016 <br /> City of Everett Public Works Department Public Works Permit#: PW1612-024 <br /> 3200 Cedar Street Associated Permit#: B1703-053 <br /> Everett, WA 98201 Planning Reference#: SEPA16-035 <br /> (425) 257-8810 Public Works Fee: $67,722.05 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> LBG 38 LLC LBG 38 LLC <br /> 1040 WEST GEORGIA ST STE 800 1040 WEST GEORGIA ST STE 800 <br /> VANCOUVER, BC, V6E4H1 VANCOUVER, BC, V6E4H1 <br /> PHONE: 4252604439 PHONE: 4252604439 <br /> TAX PARCEL ID#: 28040300200100 SITE ADDRESS: 5900 36TH AVE W <br /> DESCRIPTION: SITE WORK FOR SOUNDVIEW BUSINESS CAMPUS <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Works Department dated <br /> 8/16/2017.Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construction to set up a pre- <br /> construction consultation.All inspections must be formally requested. See the attached handout for phone number and online instructions <br /> to Request an Inspection. <br /> 6. Seasonal wet weather construction limitations apply to this project/permit. See attached excerpt from Ecology for compliance <br /> requirements. Strict construction scheduling will be required. Coordinate with the Public Works Inspector Jim Knappert. <br /> 7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense. This work shall <br /> be under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work <br /> shall be scheduled 3-4 weeks in advance. <br /> 8.As-builts of storm, sanitary sewer, and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 9. On-site water main will be staked within an easement to the City. The easement documentation will be submitted to the City prior to <br /> issuance of permits and must be recorded by the project team with a copy of the recorded document submitted to the City prior to final <br /> approval/close out of the permit. <br /> 10. A 1-year Warranty Bond in the amount of 10% of the construction costs for all public improvements shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 11.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 12.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Contact the Planning <br /> Department at 425-257-2273 to schedule the inspection. <br /> 13.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection line to request a Final <br /> for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Paving (496,630SF)...................................$2,483.15 <br /> Erosion Control.............................................$200.00 <br /> Grade/Fill/Excavate(754,300CY)............$4,585.00 <br /> PW Plan Review........................................$20,151.30 <br /> PW Site Inspection....................................$40,302.60 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />