My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4090-25
>
Ordinances
>
Ordinance 4090-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 7:35:48 AM
Creation date
5/19/2025 7:35:37 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4090-25
Date
5/14/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ORDINANCE NO. __________ <br />An Ordinance creating a special improvement project entitled "Later Phase Eclipse Mill Park”, Fund <br />308, Program 083, to accumulate construction costs for the Eclipse Mill Park Project in the amount of <br />$4,400,000. <br />WHEREAS, <br />A.The City of Everett is committed to a planned parks capital improvement program as part of <br />the City of Everett Parks & Recreation Comprehensive Plan. <br />B.The City of Everett is committed to the construction of the Later Phase Eclipse Mill Park <br />Project in advance of the Eclipse Mill Park by Shelter Holdings. <br />C.The Later Phase Eclipse Mill Park Project shall include stabilization of the Snohomish <br />riverbank, river overlook, gangway and personal watercraft floating boarding dock and <br />debris deflector. <br />D.Ordinance 3839-21 established Fund 354, Program 073 to accumulate design costs for the <br />project in the amount of $600,000. <br />E.Ordinance 3986-23 was established amending Ordinance 3839-21, Fund 354, Program 073, <br />to accumulate design, bid, and construction support services for the project in the amount <br />of $1,113,752. <br />F.Additional funding is required to construct the Later Phase Eclipse Mill Park amenities. <br />NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br />Section 1. A special improvement project is hereby established as Fund 308, Program 083, and shall be <br />entitled “Later Phase Eclipse Mill Park” to accumulate all construction costs for the improvement <br />project. <br />Section 2. Authorization is hereby granted to the Parks and Facilities Department Director under the <br />administration of the Mayor, to assume full responsibility for conducting all tasks and performing all <br />necessary steps to accomplish the actions authorized by this Ordinance. <br />Section 3. The estimated cost of construction is $4,400,000. <br />Section 4. The sum of $4,400,000 is hereby appropriated to Fund 308, Program 083, “Later Phase <br />4090-25
The URL can be used to link to this page
Your browser does not support the video tag.