Laserfiche WebLink
0 CITY OF EVERETT PERMIT SERVICES <br /> EVERETT PERMIT APPROVAL & NOTES COVER SHEET <br /> WASHINGTON <br /> STANDARD CONDITIONS OF APPROVAL: REVIEWER APPROVALS: PERMIT <br /> INFORMATION: <br /> 1. Approved plans must be on job site at all times and available for inspectors. PLANNING: Site Address: <br /> APPROVED <br /> Office or commmn¢v,Planning R Economic Development No change to existing building footprint/use proposed 5901 23RD DR W SUITE <br /> 2. See face of permit for permit conditions of approval and additional requirements. PLANNING DEPARTMENT <br /> NAME: YTran <br /> DATE: 10/22/2024 100 <br /> 3. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at <br /> onlinepermits.everettwa.gov to formally request all required inspections. This approval only applies to <br /> the work being performed under Owner: <br /> Permit# B2410-026 <br /> 4. This permit must be finaled in order to close out this permit, legitmize work and grant a Certificate of Occupancy. and does not recognize any SEAWAY CORPORATE <br /> existing structure that may not <br /> 5. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER meet Zoning Code. LOT 3C <br /> 811. <br /> 6. All work shall be performed in accordance with the approved permit conditions and plans approved by the City of BUILDING: Tenant: <br /> Everett. EVERETT p Energy <br /> gY <br /> Cityof Ev Zap <br /> Permit Services n <br /> REVIEWED FOR CODE COMPLIANCE <br /> 7. Protect all existing underground utilities during construction. By Review Discipline:Building <br /> Reviewer:BMonk App. Date: <br /> Date:12/05/2024 <br /> 8. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as Review Status:Approved for Permit 10/10/2024 <br /> directed by the City PW Inspector. <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. Permit Type: <br /> COMMERCIAL BUILDING <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious <br /> surfaces will be managed on-site in a manner that does not adversely affect neighboring properties,including the FIRE: <br /> City's right-of-way and/or easements and the improvements located therein. Subtype: <br /> COMMERCIAL <br /> EVERETT <br /> Everett Fire Dept.Permit Review ALTERATION (T.I., <br /> Status:Approved <br /> Reviewed By:kbrown INTERIOR DEMO, <br /> 10/25/2024 12:04:29 <br /> PM ADDITION, ETC) <br /> Description: <br /> Adding Walls and <br /> Ceilings To Existing <br /> Structure <br /> PERMIT NUMBER: <br /> B2410-026 <br />