My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3810 RIVERFRONT BLVD 2025-06-17
>
Address Records
>
RIVERFRONT BLVD
>
3810
>
3810 RIVERFRONT BLVD 2025-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 2:24:06 PM
Creation date
6/17/2025 1:18:27 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3810
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: U2004-015 <br />Applied: 4/20/2020 <br />Issued: 12/29/2020 <br />Status: FINALED <br />Parent Permit: B1912-032 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:4/20/2020 <br />Fi n a I ed : 9/18/2023 <br />Description: BLDG B-SEWER CONNECTION PLUS 2 CONNECTIONS TO <br />THE BUILDING <br />Site Address: 3810 RIVERFRONT BLVD <br />City, State Zip Code: EVERETT, WA 98201 <br />Applicant: Eric Evans <br />Owner: RIVERFRONT PHASE 1, LLC <br />Contractor: RIVERFRONT COMMRCL INVEST LLC <br />Details: <br />SEE SEWER REMARKS IN CUSTOM SCREENS <br />BLDG B-SEWER CONNECTION PLUS 2 CONNECTIONS TO THE BUILDING <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYP <br />INSPECTOR <br />RESULT <br />REMARKS <br />6/21/2021 <br />6/21/2021 <br />PERMIT EXTENSION <br />KATHY COLLISON <br />EXTENSION <br />COVID EXTENSION <br />APPROVED <br />Notes: <br />PERMIT <br />2/9/2022 <br />2/9/2022 <br />EXTENSION- <br />CINDY BERGSMA <br />EXTENSION <br />APPROVED <br />REASON REQUIRED <br />Notes: <br />Thanks for calling me back today. Below is a snapshot of expired permits that we will extend/re-open. Construction has started/resumed on the parent <br />permits (Sitework, Building A & Building B) but have experienced significant delays due to COVID 19. <br />Dave Fiala <br />Project Engineer <br />Shelter Holdings, LLC <br />Cell 425-213-677 <br />Printed: Thursday, 15 May, 2025 1 of 2 <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.