Laserfiche WebLink
APPROVED <br /> Office d Community,Planning&Economic Development <br /> PLANNING DEPARTMENT <br /> NAME: Jessica Jarvi Permit#: PW2408-002 <br /> DATE: 1112612024 _ Site Address: 6133 Lake Chaplain Rd TESC NOTES: <br /> // � \\� ��^ / I \ I / Owner: CI Of Everett PUbIIC Works 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL(ESC)PLAN DOES <br /> \ / NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE <br /> SITE ADDRESS:APPROX.6133 LAKE CHAPLAIN ROAD,EVERETT WA 98201 Please also specify outlet protection- /// / -�, \ \� /--/ I / / \\ I I \ I 1 I / Description: Construct a gravel spur road and DESIGN(E.G.,SIZE AND LOCATION OF ROADS,PIPES,RESTRICTORS, <br /> NAME OF OWNER/APPLICANT:CITY OF EVERETT per DCSS 4-2.4(3)(missed i J PROVIDE RIPRAP INLET PROTECTION / -- I 1 turnaround area <br /> -- CHANNELS,RETENTION FACILITIES,UTILITIES). <br /> PARCEL NUMBER:29072500400400 commenting on this in the fi 4 '//�PER DOSS TABLE 4-2.1 / <br /> -/ / l <br /> round). /j/ ,/// \ \ 12+00 _ 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, <br /> PROJECT DESCRIPTION:CONSTRUCT A GRAVEL SPUR ROAD AND /j// /\\ \ �� -- 12+16 --- I I I \ \ 1 / / e MAINTENANCE,REPLACEMENT,AND UPGRADING OF THESE ESC FACILITIES <br /> TURNAROUND AREA TO ALLOW UNLOADING OF SPOILS FROM THE CITY'S //j/ \ j j\��- I / /" / / \ \ I / \ I I \ I I I / / EVERETT City of Everett Permit Services IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL <br /> WATER FILTRATION PLANT TO THE LANDFILL AREA(HIGHLIGHTED YELLOW) / / / ,/ \ \ \ I �\ I \ 1 I / CONSTRUCTION IS COMPLETED AND APPROVED AND <br /> \ - =7 --1 I I I II I 1 \ 1 I // / By Review Discipline,plCe Public Works COMPLIANCE <br /> VEGETATION/LANDSCAPING IS ESTABLISHED. <br /> Reviewer:THerman 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE <br /> \, Date:11/2612024 CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.DURING THE <br /> 18"PE CULVERT 40LF @ 5.11% Review Status:Approved for Permit CLEARING <br /> CONSTRUCTION <br /> LIMITS SHALL BEEOPERMIT-FED.D HE F FLAGGING SHALL FLAGGED <br /> \ \ WATTLES— � \ / Approved as Noted MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF <br /> \ \ \ HIGH-VISIBILITY. / CONSTRUCTION. <br /> IBMPC235 1 V A 1 I'•. E Q�vv BMPC103 <br /> CLEAR AND GRUB \V AAA V -_- �> VA l I I I \ I 11 I\ I / / 4. THE ESC FACILITIES SHOWN ON THIS PLAN SHALL BE CONSTRUCTED IN <br /> / CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES AND IN SUCH <br /> IGRADEROAD AT 1'• .•\ \ \\\ _ \ \ \ I I 1 I ( / A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER <br /> I I 1 \`.A- L RE SI SEED WITH/GRASS J\\\\\\\ - \ I\ / // DO NOT ENTERTHE DRAINAGE SYSTEM,ROADWAYS,OR VIOLATE <br /> r I.i(y MAX.MAX.2%CROSS \\ _> <br /> SCALE / / I I SLOPE = I \ \ AND MULCH USING \\\\\\ J I /) / // APPLICABLE WATER QUALITY STANDARDS. <br /> I Z I A V oot STRAW FOR SOIL AvVAV11 -_--�� � =" _/ 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br /> f"', / / l / / I A I 1 A �1 STABILIZATION. AMEND \NOVA ------ - ____ REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS.DURING THE <br /> 40 20 0 FEET 40 80 11111j111A /� / ! 1112'WIDE GRAVE SPUR \\ \\': `t,A SOILSASNEEDED PER )1AVA _ < - _--_ CONSTRUCTION PERIOD,THESE ESC FACILITIES SHALL BE UPGRADED AS <br /> lI I II I I I ROAD-2598 SQ.FT. �\V A \,� BMP T5.13 AND COE STD IIIIII// ��� �- j\> 1 I ( /���/�1�1��� � \_ � NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br /> IIIIIIIIIIIL� �� �� I I V A I \ I 1 A t DWG5202 AND�OR 203. Illllllll _�A \��� I L (-I L I / / I t_ A A V '\ �__�������� SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE. <br /> EDGE OF DAYLIGHT LINE\V ;. l -� �\� _ �� ���A A 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY <br /> Please u date the full dispersion/green i � _ - -- -_--_-- <br /> p I IIIII I VVA A \ % V A .�TST i IIII _ VA _ - �� —_ _ - THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED <br /> hatch area t0 ShOW that there WIII be the i I I L= �-/A\�A� v A I \ V A V A \- 1 I I I I I I-__i A A� _ -3_- - AA _- _ -- -_ --_ FUNCTIONING,ESPECIALLY AFTER STORM EVENTS. <br /> min.required downstream flow path of IIIL-� ��,nA\\Vv �v �V A \ V A \: ass !III cv-- A�_�; ��- <br /> �vAV A Z \ TURNAROUND <br /> 100 ft.from She entire length Of She graVEa IIIIII III I _ ;�� �A v \ V BMP T5.30 A\ \V V A f �— - AREA =__ �__ --� ,Ax — _ ___—__ 7 THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br /> access road. IIII I -����� AVA v v� V�V - FULL DISPERSION AREA V A AID -- �23985Q.FT. 7� ������\VAV�� -'�� - -_-_� MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS <br /> 32486.45E V -- __----�/ - AAv��v���� v A-- FOLLOWING A MAJOR STORM EVENT. <br /> o� a _ - ii�=��-�� - <br /> I 25 __ _ v _ - - _ _-_ -_ 8. APPROPRIATE MEASURES SHALL BETAKEN TO STOP SEDIMENT FROM <br /> VAAA\VA\V ) •• �-- /----------- -- � �A AA����� _ _ A Q�VAV ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL.IF BMPS <br /> FAIL AND SEDIMENT-LADEN WATER IS LEAVING THE SITE,IMMEDIATELY <br /> VAVA\VI\\ l/ 1 --��V I 6_-Z3%Y NOTIFYYOUR PUBLICWORKS INSPECTOR. <br /> - <br /> Z= _= _� v / / // ---- _ / - AVA��;���� <br /> ��c„� <br /> 9. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR <br /> illlll---_- UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBERITHROUGH <br /> _---������'� ///^A�y\y�V�V�VAA VA- VAAIA�A / / ����� �--������ yVA ---� �- - APRIL 30 AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH <br /> /l __ __ _ �_� SEPTEMBER 30. <br /> -_ - <br /> �A\�A ---- �_ �,�/.-�_______ _- _-_-=—__���________- ____-- �_�3� ���� I r�����_�v ��A VA`-- A '--_----- 10. THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP SHALL BE <br /> �VOC ������A�� - - RETAINED ON SITE OR READILY AVAILABLE TO THE CONTRACTOR <br /> THROUGHOUT THE DURATION OF THE CONSTRUCTION PROJECT. <br /> __--__-_-_-- <br /> I <br /> - -- _ �A / ��vOvp V A V - __ 11. DESIGN,INSTALL,IMPLEMENT,AND MAINTAIN EFFECTIVE POLLUTION <br /> vvvv vv _-- <br /> �y ���A / ��pV�A�\ PREVENTION MEASURES TO MINIMIZE THE DISCHARGE OF POLLUTANTS. <br /> X�� ��� _-- <br /> __ A v AAv v A vvv v �A A ZS ^ <br /> TESC ELEMENTS <br /> 1p9'��� ELEMENT#1:PRESERVE VEGETATION/MARK CLEARING LIMITS <br /> /A�Av� ��v�A�� <br /> ll�-----__-� AVAA������������ -BMP C103:HIGH-VISIBILITY FENCE <br /> A <br /> AVA�V��A�������� <br /> II`--__ __�����������-�����������///%�///!/•������VVA�AVVAVA �A�AA���������������������� �� ���vv���, �;c`_-,_��_�."�����'���.�1s-���.�� ,l�.��. oh,ky l oejp� Z <br /> _----_ <br /> ELEMENT#2:ESTABLISH CONSTRUCTION ACCESS <br /> -BMP C107:CONSTRUCTION ROAD/PARKING AREA STABILIZATION�-�A V <br /> j 0.479 y�� a Z��� vQ�� �vpvvJi-�A� -__- <br /> (!,`f �j �t \ � ��v Q✓ ELEMENT#3:CONTROL FLOW RATES <br /> A A A A �� I 'i4✓J v v A A\\_---- <br /> ' z�� �� A\ -1 J / '\ V Vv��� I V A� --_ _ -BMP C235:WATTLES Please Update t0"Not <br /> Applicable". <br /> - ELEMENT#4:INSTALL SEDIMENT CONTROLS�� x\ � <br /> VAv� v � -BMP C235:WATTLES <br /> VA <br /> ZE SOILS <br /> ELEMENT#S:-BMP 120:TE <br /> -BMP TEMPORARY AND PERMANENT SEEDING <br /> -BMP C321:MULCHING <br /> m LAKE CHAPLAIN SHORELINE _------__-_-__--_- <br /> / <br /> -" j ELEMENT#6:PROTECT SLOPES <br /> -NOT APPLICABLE <br /> ELEMENT#7:PROTECT DRAIN INLETS <br /> PLAN <br /> ri -NOT APPLICABLE <br /> ZI SCALE: 1 40' <br /> ELEMENT#8:STABILIZE CHANNELS AND OUTLETS <br /> v GENERAL NOTES: -NOTAPPLICABLE <br /> w d 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED,CONCEALED,OR 760 760 756 756 LEGEND <br /> m PUT INTO USE UNTIL IT HAS BEEN INSPECTED,TESTED,AND ACCEPTED BY -ROAD ELEMENT#9:CONTROL POLLUTANTS <br /> m N THE CITY OF EVERETT. <br /> -NOT APPLICABLE <br /> ^t LANDFILL AREA m d 2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT ELEMENT#10:CONTROL DEWATERING <br /> a 3 DESIGN ANDCONSTRUCTION STANDS AND SPECIFICATIONS AND THE TURNAROUND AREA -NOT APPLICABLE <br /> w WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD,BRIDGE,AND 756 756 752 752 <br /> Q MUNICIPAL CONSTRUCTION(CURRENT EDITION). CLEARING/GRUBBING AREA ELEMENT#11:MAINTAIN BMPS <br /> °C -0.06% 12"MIN. EPTH 0 -BMP C150:MATERIALS ON HAND <br /> Q 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED w 125% 1.40% - -3.8 LU w LU FULL DISPERSION AREA <br /> a FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE.THE LU 8% \ w w w ELEMENT#12:MANAGE THE PROJECT <br /> a CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS -BMP C150:MATERIALS ON HAND <br /> N N AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN.IF 752 •2•Iyo 752 748 748 -BMP C152:SCHEDULING <br /> m Q CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION,THE <br /> i CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY 406 0 18"PE PIPE 40LF @ 5.11% ELEMENT#13:PROTECT LID BMPS <br /> N > CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR STARTINV.746.82 -NOT APPLICABLE <br /> o v TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT.E END INV.748.88 <br /> C <br /> 4. DESIGN SHALL COMPLY WITH THE EVERETT MUNICIPAL CODE(EMC),CITY 748 ........ 748 744 744 <br /> ADOPTED STORMWATER MANAGEMENT MANUAL,POLICIES AND 9+60 10+00 10+40 10+80 11+20 11+60 12+00 12+40 9+60 10+00 10+40 10+80 11+20 11+60 <br /> w i CRITERIA SET FORTH INN THE CITY OF EVERETT'S DESIGN AND <br /> CONSTRUCTION STANDARDS&SPECIFICATIONS. ROAD PROFILE CULVERT PROFILE <br /> a <br /> ov <br /> a M SCALE: LORE: 1"=40' SCALE: HORZ: 1"=40' <br /> VERT: 1"=4' VERT: 1 4' <br /> EVERETT Everett, <br /> Cedar Street <br /> Everett WA 98201 ROAD PLAN <br /> PUBLIC WORKS 425.257.8800 everettwo.gov <br />