Laserfiche WebLink
Permit #: RB1502-004 <br />Site Address: <br />PROPANE TANKS, HEAT PUMPS AND <br />OTHER EQUIPMENT OR APPURTENANCES <br />MAY NOT BE LOCATED IN THE FRONT <br />AND SIDE SETBACKS, PROPANE TANKS <br />REQUIRE ADDITIONAL. PERMITS ISSUED <br />BY THE EVERETT F,lAE DEPARTMENT <br />PRIOR TO 1Nsv11LATj0N. <br />Roof trusses to be designed <br />and drawing prepared by <br />a State licensed structural; <br />engineer.. <br />A Benchmark Is, Required On Site <br />To Verify APpro red BuiidiRg Htight <br />CONCRETE.-EI'�CASED ELECTRODE <br />(LIFER GROU Di REQUIRED <br />PER NEC 20.50 <br />(INSPECTED AT FOOTINGS) <br />Additional Permits Are Required <br />For This Project To Include: <br />El Plumbing ❑ Sprinkler <br />E3MeChanical ❑ Fire AlarM <br />FA Electrical <br />PROJECT TEAM <br />Owner/Developer Polygon Northwest Company <br />11624 SE 5th Street, Suite 200 <br />Bellevue, WA 98005 <br />(425) 586-7700 <br />Architect: Milbrandt Architects, Inc., P.S. <br />25 Central Way, Suite 210 <br />Kirkland, WA 98033 <br />(425) 454-7130 <br />Structural Engineer: CT Engineering <br />180 Nickerson Street - Suite 302 <br />Seattle, Wa. 98109 <br />(206) 285-0618 <br />Civil Engineer Core Design, Inc. <br />1471.1 NE 29th Place, Suite 101 <br />Bellevue, WA 98007 <br />(425) 885-7877 <br />GENERAL NOTES <br />1. "Comply with 201.5 IRC and all applicable codes and ordinances of the local <br />jurisdiction and the State of Washington. <br />2. Do not scale drawings. <br />3. Verify all rough -in dimensions for equipment provided in this contract or <br />by others. All rough -ins shall be approved and fireblocking shall be <br />installed prior to framing inspection. <br />4. Verify size and location of and provide all openings through floors and <br />walls, furring, anchors, inserts, rough bucks and backing for surface <br />mounted items. <br />5. Provide furring as required to conceal mechanical and electrical work in all <br />finished areas. <br />6. All swinging doors not located by dimensions on plans, interior elevations, <br />or details shall be 3 from face of stud to edge of rough openings or <br />centered between room partitions as shown. <br />7. Plans are drawn assuming the following rough openings: <br />Swinging doors: Nominal size +2" <br />Bi-Fold doors: Nominal size +1-%2". <br />Bi-Pass doors: Nominal size +0". <br />Windows: Nominal size +0". <br />Sliding glass doors: Nominal size +0". <br />8. Fill where required with earth free from organic material. Compact fill in <br />12" layers maximum.. <br />9. "Finish Floor" refers to the top of concrete slab or top of wood floor <br />sheathing . <br />10. Exterior walls shall be 2x6 studs at 16" o.c. and interior walls shall be 2x4 <br />studs at 16" o.c., unless noted otherwise. <br />11. Unless otherwise noted, plan dimensions are to face of studs and face of <br />concrete walls. <br />12, Refer to interior elevations for cabinet and counter lengths, dimensions, <br />countertop materials and detail reference. Verify all existing dimensions <br />before installation. <br />13. Provide caulking between sole plates and subfloor and between rim joists at <br />both top plate and subfloor. <br />14. Hydrants shall be in service prior to start of framing. <br />15. Provisions shall be made for the control and drainage of surface water <br />around building. IRC Sec R401.3. <br />IF BUILDING IS NOT POSITIONED AS 16. Milbrandt Architects is not responsible for construction means, methods, <br />.techniques or procedures, or for the safety precautions and programs in <br />INDICATED ON APPROVED SITE PLAN, <br />A NEW SITE PLAN SHALL BE SUBMIT_ contracconnection with the work, and is not responsible for the failure of any <br />TED, NO rUI'�T:tE� INSPECTIONS WILL varioust�ontrac r or bcontractodocumen r to carry out the work in accordance with the <br />BE MADE ON THIS PROJECT UNTIL THE what is shown on these dr wand or governing jurisdiction, regardless of <br />REVISED SITE PLAN HAS BEEN APPROV- <br />DEPTS. a ngs, <br />ED BY THE BUILDING/pUBLIG WORKS <br />R 19 ®vmers responsibility_ to establish and stakes ,, i <br />property lines. <br />GRADING AND DRAINAGE.`'.;,: <br />Provisions shall be made for the control and drainage of surface Building Code: <br />water around buildings by: gutters, drain lines, inlets and catch <br />basins or other necessary drainage structures and shall be installeoor Areas: <br />where storm water disposal cannot be obtained without their use or <br />where erosion cannot be prevented by finish grading and planting. <br />Dry wells shall not be installed in areas where the soil is not well <br />drained and-lor porous. <br />2„ Grading shall be provided to insure: Construction Type: <br />(a) Diversion of water away from buildings. <br />(b) Prevention of standing water and soil saturation detrimental <br />to structures and lot use. <br />(c) That natural drainage channels or basins are not blocked or <br />filled. <br />(d) Provisions for the disposal of water from a lot., <br />(e) Protection of adjoining property, <br />„THE C.Q.E. HAS NOT REVIEWED THESE <br />PLANS FOR COMPLIANCE WITH 13CM04.55:1 <br />SPRINKLER VALVES AND COMPONEWS <br />MUST BE MAINTAINED AT 40OF <br />MINIMUM TEMPERATURE PER NFPA 13 <br />:,ENERAL INFORMATION <br />ENERGY NOTES <br />LIST OF DRAWINGS <br />i <br />1. Code: 201.5 Washington State Energy Code. <br />Al <br />Cover Sheet <br />2. Compliance: Chapter 4 - using climate zone catagory 5 & marine 4 for all calculations. <br />A2 <br />First and Second Floor Plans & Stair Plan <br />All residential units shall comply with the Requirements By Component Table 402.1.1. <br />A3 <br />First and Second Floor Electrical Plans <br />Including but not limited to the following: <br />Cade Requirements <br />A4 <br />Foundation Plan <br />} Window U-Factor 0.30 - ( 0.28 used) <br />A5 <br />Floor Framing & Shearwall Plans <br />Ceiling R-Value R-49 <br />A6 <br />Roof Plan & Roof Framing Plan <br />Wood Frame Wall R-Value R-21 int. <br />Floor R-Value R-30 - (R-38 used) <br />A7 <br />Exterior Elevations, Sections, and Interior Elevations <br />Below Grade Wall 10/15/21 int. + TB <br />A8 <br />Details <br />Slab R-Value & Depth R-10, 2ft <br />"int." (intermediate framing) denotes standard framing 16" o.c. with headers <br />insulated with a min. of R-10 (see 12/D2) and corners fully insulated (see 12/DI). <br />S1.0 <br />Structural Notes <br />Note to Bldg. Dept. An Energy Credit Checklist was submitted with Application. <br />S1.1 <br />Shearwall Schedule & Details <br />3. Efficient building envelope with R-38 floors and vertical fenestration of U=.28. to <br />51.2 <br />Holdown Schedule & Details <br />comply with Table 406.2, Option I a. <br />4. A high efficiency gas furnace with a AFUE of 94% will be used to comply with Table <br />S6.0 <br />Typical Concrete Details <br />406.2, Option. 3a. <br />S6.1 <br />Miscellaneous Details <br />5. Efficient water heating with showerheads and kitchen faucets rated < 1.75 gpm and <br />S9 0 <br />Typical Floor Framing Details <br />lavatory faucets rated < 1.00 gpm to comply with Table 406.2, Option 5a. <br />6. Efficient gas water heating with a minimum EF of 0.91 to comply with Table 406.2, Option. <br />S9.1 <br />Typical Roof Framing Details <br />5c. <br />6. See D I for Energy Notes. <br />7. Fuel for heat and domestic hot water is Natural Gas. <br />D1 <br />Details <br />8. Hot water piping shall be insulated to a minimum of R-4 in both heated and unheated <br />D2 <br />Details <br />spaces per R403.4.2. <br />D3 <br />Details <br />9. For insulation values see the Insulation. Box on Sheet A2. <br />10. No air conditioning will be provided. <br />2015 International Residential Code with State Amendments as <br />VENTILATION NOTES <br />1. Design Criteria: 2015 International Residential Code and the 2015 International <br />Mechanical Code with Washington. State amendments. <br />2. System T e: <br />Per IRC Section M1507-Local exhaust ventilation <br />Per IRC Section Ml 507.3.5-Intermittently operated whole house ventilation systems <br />integrated with forced air ventilation systems. <br />3. 1 Approach: Prescriptive- per IRC Section M1507 <br />4. Specifics: See Electrical Plans <br />5. Outdoor air connection to the return. air stream shall be located upstream of the forced -air <br />system blower and shall not be connected directly into a furnace cabinet. <br />6. The system will be equipped with a motorized damper connected to the automatic <br />ventilation control as specified per IRC Section M1507.3.2. <br />7. Specific requirements for the mechanical system, such as but not limited to the duct size are <br />to be determined by the mechanical bidder/design contractor. <br />DESIGN LOADS <br />See sheet S LO for Design. Loads. <br />modified and adopted by the local jurisdiction. <br />1 st Floor Garage <br />463 SF <br />Covered Porch <br />129 SF <br />l st Floor Residence <br />869 SF <br />2nd Floor Residence <br />1,367 SF <br />Total Enclosed Building Area <br />21236 SF <br />V-B <br />_ owner <br />Tenant: <br />App. Date: <br />Proposed Use: <br />Description: <br />Reviewed By:_ <br />(.Office Set <br />r*NOTE: 2�51RC <br />POLYGON WLH LLC <br />[TenNamel <br />2/10/2015 <br />SFR <br />SFR BASIC/2015 IRC - PLAN #3020 A,B,C <br />Date: <br />Job Site Set Fire/Planning Set <br />5052 REGISTERED <br />ARCHITECT <br />ROBERT E. WEIBLE <br />STATE OF WASHINGTON <br />L <br />Qi <br />N <br />C� <br />Q <br />o <br />V <br />Q <br />0 <br />0 <br />a <br />0 <br />u <br />o <br />z <br />-a <br />o <br />0 <br />co <br />o <br />M <br />O <br />L <br />r <br />�, <br />v) <br />t~- <br />Z <br />r <br />O <br />A <br />� <br />it <br />C. <br />0 <br />' <br />O <br />E <br />O <br />N <br />6L <br />to <br />0 <br />N <br />• <br />w <br />+ <br />O <br />L <br />> <br />Z <br />r. <br />® <br />W <br />O <br />go <br />a <br />Q <br />o Job No.: 14-38 <br />U <br />Sheet No.: <br />0 <br />