Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> RCW 64. 55 : MULTI - FAMILY, MIXED- USE, AND TOWNHOME <br /> BUILDING ENCLOSURE SUBMITTAL CHECKLIST <br /> EXEMPT BUILDINGS: Non-residential buildings, hotels,motels, dormitories, care facilities,floating homes, mixed- <br /> use buildings with maximum of two residential attached dwelling units,duplexes and townhouses(as defined by <br /> the IRQ where each unit is on a single platted lot(recorded zero lot line subdivis ns). <br /> NOTE: The City of Everett will not review or approve plans or inspe the work required by RCW <br /> 64.55, but will collect the required submittals per RCW 64.55.020(1)at d(2). <br /> PERMIT SUBMITTAL AND CERTIFICATE OF OCCUPANCY SUBMITTAL REQUIREMENTS: <br /> Signed Permit Application(s) (1 Copy, as applicable) Buildiig Permit Application <br /> *For multi-building apartment complexes,we will require one application per building <br /> Construction Plans (2 sets; 1/4" = 1' minimum scale. If in istorical overlay, 3 sets <br /> required. 24"x36" maximum sheet size, stapled bound ed e, 5/8"thick, all pages <br /> uniformly sized, each page consecutively numbered) <br /> Completed RCW 64.55 Worksheet(see below) per building (with one of the following <br /> options checked): <br /> Valuation is 5%or less of the assessed value of the arket improvement. —Show <br /> the calculations for the valuation of the work, and t e percentage of the assessed <br /> value. <br /> ❑ Two complete sets of building enclosure details whi h meet WA State RCW 64.55. <br /> —Independent inspection required during constructi n with letter of certification. <br /> ElCertified record copy of the "Sale Prohibition Coven nt" RCW 64.SS.010 (6) (a) <br /> (vi). <br /> ❑ Single platted lot per townhouse, documented by recorded approved site plans <br /> per RCW 64.55,010 (6) (b) (iii). This must be submitted prior to obtaining a <br /> Certificate of Occupancy. <br /> Note:The worksheet item selected must be submitted prijDr to obtaining a building <br /> permit. <br /> Permit Submittal Fee (Plan review fee) <br /> RCW 64 55 Checklist(2024) Page i of <br />