My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3904 FEDERAL AVE 2022 Plans 2025-09-11
>
Address Records
>
FEDERAL AVE
>
3904
>
Plans
>
3904 FEDERAL AVE 2022 Plans 2025-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 10:24:41 AM
Creation date
9/11/2025 10:24:24 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3904
Permit
B2201-053
Year
2022
Notes
PV SOLAR ROOF MOUNT INSTALLATION, 7.56KW, 2 CIRCUITS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A B I C D E I F G I H <br /> AERIAL VIEW ELECTRICAL NOTES GENERAL NOTES <br /> ti 1. WHERE ALL TERMINALS OF THE 1. PRIOR TO THE COMMENCEMENT OF ANY <br /> DISCONNECTING MEANS MAY BE WORK, THE CONTRACTOR SHALL NOTIFY <br /> ENERGIZED IN THE OPEN POSITION, A THE DESIGNER OF ANY DISCREPANCIES <br /> SIGN WILL BE PROVIDED WARNING OF WITH THE DESIGN IN ANY CAPACITY. <br /> THE HAZARDS. (PER ART. 690.17) ESPECIALLY RECOMMENDATIONS, CODES, <br /> 2. EACH UNGROUNDED CONDUCTOR OF OR REGULATIONS & RULES OF THE <br /> = - - THE MULTIWIRE BRANCH CIRCUIT WILL AUTHORITY HAVING JURISDICTION, WHICH <br /> BE IDENTIFIED BY PHASE AND SYSTEM. SUPERSEDED THE NEC. <br /> y (PER ART. 210.5) 2. ALL DIMENSIONS TO BE VERIFIED BY <br /> 3. A NATIONALLY RECOGNIZED TESTING CONTRACTOR PRIOR TO COMMENCEMENT <br /> LABORATORY SHALL LIST ALL OF WORK. <br /> i EQUIPMENT IN COMPLIANCE WITH 3. CONTRACTOR IS RESPONSIBLE FOR ALL <br /> ARTICLE 110.3. SAFETY PRECAUTIONS, OSHA <br /> cli w �ff Mj <br /> 4. ALL WIRES SHALL BE PROVIDED WITH REQUIREMENTS ETC. FOR THE SITE, N <br /> STRAIN RELIEF AT ALL ENTRY POINTS INCLUDING EXISTING SITE HAZARDS. <br /> -� - INTO BOXES AS REQUIRED BY UL LISTING 4. SYSTEM IS GRID INTERACTIVE/INTERTIED <br /> r�_1 5. MODULE FRAMES SHALL BE GROUNDED VIA A UL LISTED POWER-CONDITIONING <br /> AT THE UL-LISTED LOCATION PROVIDED INVERTER. <br /> BY THE MANUFACTURER USING 5. SYSTEM HAS NO ENERGY STORAGE OF <br /> UL-LISTED GROUNDING HARDWARE. ANY KIND, OR UPS. <br /> 6. MODULE FRAMES, RAIL, AND POSTS 6. ALL SOLAR MOUNTING FRAMEWORK TO <br /> SHALL BE BONDED WITH EQUIPMENT BE GROUNDED. <br /> GROUND CONDUCTORS AND GROUNDED 7. FOLLOW MANUFACTURERS SUGGESTED <br /> AT THE MAIN ELECTRICAL PANEL. INSTALLATION PRACTICES AND WIRING <br /> M <br /> 7. THE DC GROUNDING ELECTRODE SPECIFICATIONS. Lo <br /> CONDUCTOR SHALL BE SIZED 8. ALL WORK TO BE IN COMPLIANCE WITH <br /> RESIDENCE PHOTO ACCORDING TO ARTICLE 250.166B & THE INTERNATIONAL BUILDING CODES. <br /> 690.47. (IBC) <br /> 9. ALL ELECTRICAL WORK TO BE IN <br /> OF WASy <br /> ��OR JONFS COMPLIANCE WITH THE NATIONAL <br /> ti ELECTRIC CODE (NEC) <br /> . <br /> + co 2 <br /> 2 1148 8 Q� <br /> IS <br /> 01/27/2022 <br /> STRUCTURAL ONLY <br /> i - SHEET INDEX <br /> - <br /> �'` PV 1 COVER PAGE PV 5 MOUNTING DIAGRAM <br /> n I <br /> Lo ' - 'j M PV 2 SITE PLAN PV 6 PLACARD <br /> PV 3 ELECTRICAL DIAGRAM CUT SHEETS ATTACHED <br /> PV 4 CHIKO MOUNTING <br /> DRAWN BY: DRAWING SCALE: <br /> CONFIDENTIAL-THE INFORMATION CONTAINED MJ N CUSTOM <br /> DATE: <br /> IN THIS PACKET AND SUBSEQUENT CUTSHEETS Aaron Gay DESIGN <br /> SO <br /> SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER <br /> LG rz N ANYONE OUTSIDE SOLGEN POWER. NEITHER 5100 ELM RD, 1/25/2022 <br /> SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO, WA 99301 1 <br /> P O W E R THE RECIPIENT'S ORGANIZATION, EXCEPT IN <br /> CONNECTION WITH THE SALE AND USE OF THE P: 509-931-1663 3904 Federal Ave Everett, WA 98201 PAGE# <br /> RESPECTIVE EQUIPMENT, WITHOUT WRITTEN PV 1 <br /> CONSENT FROM SOLGEN POWER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.