Diverse Earthworks 9/26/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks 9/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:43:32 PM
Creation date
9/30/2025 4:43:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks
Approval Date
9/26/2025
Council Approval Date
9/10/2025
End Date
8/31/2026
Department
Parks & Community Services
Department Project Manager
Lisa Page
Subject / Project Title
Forest Park Pickleball Project
Tracking Number
0004968
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 52 13 - 1 <br /> <br /> <br /> <br />Forest Park Pickleball 00 52 13- 1 <br />Everett, WA <br /> <br /> <br />CONTRACT <br />THIS CONTRACT is made and entered by and between the City of Everett, Washington, <br />a municipal corporation existing under the laws of the State of Washington (the “City”) <br />and Diverse Earthworks, Inc., (the “Contractor”). <br /> <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br />agrees to furnish all labor, tools, materials, equipment, and supplies required to complete <br />in a workmanlike manner the work, improvements, and appurtenances in accordance with <br />the Specifications and Drawings and all other Contract Documents entitled: “Forest Park <br />Pickleball Project”, (the “Project”). <br />1. Contract Documents. The “Contract Documents” are defined in the General <br />Conditions. The Contract Documents are part of this Contract and are hereby <br />incorporated by reference. Terms that are capitalized in a Contract Document but not <br />defined in that Contract Document shall have the meaning defined to them in the other <br />Contract Documents. A copy of the Contract Documents that were posted for the <br />Project on Builder’s Exchange of Washington (www.bxwa.com) as of Bid Opening Date <br />is maintained by the City Clerk’s Office as a single pdf and is available as follows: <br />Link to <br />PDF <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=1978933&searchid=c0170a34- <br />2f67-4ea5-9c0e-2d3633c2841e&dbid=0 <br />This is a 565-page PDF digitally signed by City of Everett 2025.09.25 08:45:15-7’00’ <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to <br />signing this Contract. City and Contractor agree that this pdf contains all posted <br />Contract Documents as of the Bid Opening Date. City and Contractor further agree that <br />this pdf may contain some other documents (such as Reference Information) that are <br />not Contract Documents. <br />2. Contract Time. Substantial Completion of the Work shall be achieved within <br />(180) calendar days after the effective date of the Notice to Proceed. Physical <br />Completion shall be within (30) calendar days after the actual date of issuance of <br />Substantial Completion. <br />3. Liquidated Damages. The parties agree the City will suffer damage and be put <br />to additional expense in the event that the Contractor does not complete the Work in all <br />respects and have it ready for use by the Substantial and Physical Completion dates <br />stated above. Because it is difficult to accurately compute the amount of such costs <br />and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br />damages for each and every calendar day (or working day, if Contract Time is <br />described in working days) in the amounts set forth in this Section. For failure to <br />achieve Substantial Completion by the Substantial Completion date stated above, the <br />Contractor shall pay liquidated damages to the City computed at the daily rate of fifteen
The URL can be used to link to this page
Your browser does not support the video tag.