My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 10/28/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:51:32 AM
Creation date
10/29/2025 10:49:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
10/28/2025
Council Approval Date
10/22/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WPCF Headworks Replacement - Design
Tracking Number
0004998
Total Compensation
$8,998,917.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />PROFESSIONAL SERVICES AGREEMENT <br />This Professional Services Agreement (“Agreement”) is effective as of the date of last <br />signature below and is between the City of Everett, a Washington municipal corporation (the <br />“City”), and the Service Provideridentified in the Basic Provisionsbelow(“Service Provider”).This <br />Agreement is for the purpose of the Service Provider providing services to the City as set forth in <br />the Agreement. This Agreement includes and incorporates the Basic Provisions, the attached <br />General Provisions, the attached scope of work (Exhibit A), and the attached method of <br />compensation (Exhibit B). <br />BASIC PROVISIONS <br />Service Provider <br />Brown and Caldwell, Inc. <br />701 Pike Street, Suite 1300 <br />Seattle, WA 98101 <br />dbergdolt@BrwnCald.com <br />City Project <br />Manager <br />Zach Brown <br />City of Everett – Public Works <br />3200 Cedar St <br />Everett, WA 98201 <br />zbrown@everettwa.gov <br />Brief Summary of <br />Scope of Work Engineering services for the WPCF Headworks Replacement Project. <br />Completion Date December 31, 2028 <br />Maximum <br />Compensation <br />Amount <br />$8,998,917.00
The URL can be used to link to this page
Your browser does not support the video tag.