Laserfiche WebLink
" a PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Date: <br />4/15/2016 <br />Public Works Permit #: <br />PW1604-022 <br />Parent Permit #: <br />PW1507-046 <br />Planning Reference #: <br />Public Works'Fee $: <br />$ 4,800.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />Creekside Investments LLC Creekside Investments LLC <br />4532-B Evergreen Way 4532-B Evergreen Way <br />EVERETT WA 98203 EVERETT WA 98203 <br />PHONE: 4257542561 PHONE: 4257542561 <br />TAX PARCEL ID # 00531700302000 SITE ADDRESS: 6601 HIGHLAND DR <br />TRAFFIC MITIGATION FOR 4 LOT SHORT PLAT <br />CREEKSIDE SHORT PLAT <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before .you dig. TOLL FREE NUMBER 811 m <br />SP <br />e� <br />-, <br />Public Works Permit Fee Breakdown: <br />Traffic Mitigation.........................$4,800.00 <br />nr� <br />o <br />Na <br />r•.:amy <br />c <br />ra <br />'� <br />cs <br />M_ <br />(} <br />CO <br />r•.3 <br />—i <br />Ln <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless the <br />City of Everett from any and all claims for damages, costs, expenses, or <br />(� Z causes of action that may arise because of installation and maintenance of the <br />improvement or other right-of-way use hereto applied for and further agrees to <br />Approved for Construction Da-fd remove same upon notice from the City and to replace public property <br />damaged thereby. <br />FINAL INSPECTION Date _zz_ <br />Approved as Constructed Signature of Al5plicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />