My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington Department of Ecology 12/23/2025
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington Department of Ecology 12/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 11:12:32 AM
Creation date
12/29/2025 11:11:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington Department of Ecology
Approval Date
12/23/2025
Council Approval Date
11/12/2025
End Date
3/31/2028
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility Site Construction Ecology Grant
Public Works WO Number
WQC-2026-EverPW-00408
Tracking Number
0005052
Total Compensation
$1,764,705.88
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Agreement No. WQC-2026-EverPW-00408 <br />WATER QUALITY COMBINED FINANCIAL ASSISTANCE AGREEMENT <br />BETWEEN <br />THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br />AND <br />CITY OF EVERETT <br />This is a binding Agreement entered into by and between the state of Washington , Department of Ecology, <br />hereinafter referred to as “ECOLOGY,” and City of Everett, hereinafter referred to as the “RECIPIENT,” to carry out <br />with the provided funds activities described herein. <br />City of Everett Port Gardner Water Quality <br />Program – Phase 2 Construction <br />GENERAL INFORMATION <br />Project Title: <br />Total Cost: <br />Total Eligible Cost: <br />Ecology Share: <br />Recipient Share: <br />The Effective Date of this Agreement is: <br />The Expiration Date of this Agreement is no later than: <br />Project Type: <br />Project Short Description: <br />This project will improve water quality in Port Gardner Bay and Puget Sound through installation of a Filterra <br />Bioscape at Port Gardner Storage Facility in the City of Everett. This project will provide treatment for total <br />suspended solids (TSS), oil (total petroleum hydrocarbons), dissolved copper and zinc, and total phosphorus. <br />Additional benefits of this project include combined sewer separation and combined sewer overflow (CSO) <br />reduction. <br />Project Long Description: <br />The RECIPIENT acquired the former Kimberly-Clark Wastewater Treatment Plant site and is retrofitting the site <br />to provide temporary combined sewer overflow storage and regional stormwater treatment. The site is now <br />known as the Port Gardner Storage Facility (PGSF). The PGSF is located south of Naval Station Everett and <br />north of Port of Everett Hewitt Terminal on the west side of West Marine View Drive . <br />$16,457,403.25 <br />$11,764,705.88 <br />$10,000,000.00 <br />$1,764,705.88 <br />07/01/2025 <br />03/31/2028 <br />Stormwater Facility <br />Docusign Envelope ID: D814CB0A-309D-42B0-8AE7-7273045711DF
The URL can be used to link to this page
Your browser does not support the video tag.