My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />PROFESSIONAL SERVICES AGREEMENT <br />This Professional Services Agreement (“Agreement”) is effective as of the date of last <br />signature below and is between the City of Everett, a Washington municipal corporation (the <br />“City”), and the Service Provider identified in the Basic Provisions below (“Service Provider”). This <br />Agreement is for the purpose of the Service Provider providing services to the City as set forth in <br />the Agreement. This Agreement includes and incorporates the Basic Provisions, the attached <br />General Provisions, the attached scope of work (Exhibit A), and the attached method of <br />compensation (Exhibit B). <br />BASIC PROVISIONS <br />Service Provider <br />Jacobs Engineering Group, Inc. <br />1100 112th Avenue NE, Suite 500 <br />Bellevue, WA 98004 <br />Jeannette.DeLay@jacobs.com <br />City Project Manager <br />Tom Hood, P.E. <br />City of Everett – Public Works <br />2930 Wetmore Ave., 10-C <br />Everett, WA 98201 <br />THood@everettwa.gov <br />Brief Summary of Scope of Work Provide Preliminary, Final Design and Construction Support Services for Phase 2 of the <br />freight mobility corridor which includes improvements at 6 intersections. <br />Completion Date December 31, 2028 <br />Maximum Compensation Amount $2,649,646
The URL can be used to link to this page
Your browser does not support the video tag.