Laserfiche WebLink
Lenora Regional SW Facility Division C – Contract Work Order # UP3792 <br />CITY OF EVERETT, WASHINGTON <br />CONTRACT <br />THIS CONTRACT is made and entered into by and between the City of Everett, Washington, a municipal <br />corporation existing under the laws of the State of Washington (the “City”) and KLB Construction, LLC <br />(“Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to furnish <br />all labor, tools, materials, equipment, and supplies required to complete in a workmanlike manner the work, <br />improvements, and appurtenances in accordance with the Specifications and Plans and all other Contract <br />Documents entitled: “Lenora Regional Stormwater Facility” (the “Project”). <br />1.Contract Documents. This Contract is the written agreement signed between the City and Contractor <br />and includes Division C – CONTRACT, Division P - PROPOSAL, Division B – BID ITEM DESCRIPTIONS, Special <br />Provisions, Contract Plans, Standard Specifications, Standard Plans in effect as of the date Bids are opened, <br />Addenda, supplemental agreements, change orders, certifications and affidavits required by this Contract <br />and by law, and Federal requirements that apply to this Contract and Project, all of which are referred to as <br />the “Contract Documents” and all of which are hereby incorporated by reference. A copy of the Contract <br />Documents that were posted for the Project on Builder’s Exchange of Washington (www.bxwa.com) as of <br />Bid Opening Date is maintained by the City Clerk’s Office as a single pdf and is available as follows: <br />Link to <br />PDF <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=2065488&searchid=e8501a54- <br />e3ec-4beb-807a-b110cba5fc29&dbid=0 <br />This is a 781-page pdf with the first page containing City Clerk’s file recordkeeping digital signature 2026.02.04 11:03:27 -08’00’ <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to signing this <br />Contract. City and Contractor agree that this pdf contains all posted Contract Documents as of the Bid <br />Opening Date. City and Contractor further agree that this pdf may contain some other documents (such as <br />Reference Information) that are not Contract Documents. <br />2.Contract Time. Substantial completion shall be achieved within One hundred ninety-six (196) working <br />days after the effective date of the Notice to Proceed. Physical completion shall be within ten (10) working <br />days after the actual date of issuance of substantial completion. <br />3.Liquidated Damages. The parties agree the City will suffer damage and be put to additional expense in <br />the event that the Contractor does not complete the work in all respects and have it ready for use by the <br />substantial completion date stated. Because it is difficult to accurately compute the amount of such costs <br />and damages, the Contractor hereby covenants and agrees to pay to the City liquidated damages as <br />computed in Section 1-08.9 of the Standard Specifications, as may be amended by the Special Provisions, <br />for each and every working day required to accomplish substantial completion of the work in excess of the <br />period established above for substantial completion. For overruns in contract time occurring after the <br />1