Laserfiche WebLink
WATERFRONT PLACE CENTRAL <br />C2 BUILDING ABATEMENT & DEMOLITION <br />���� i ° ' � �' �I I' PORT OF EVERETT DESIGN TEAM <br />N CANADA <br />S. <br />- - <br />%k EWNGHAM PORT COMMISSIONERS CIVIL/STRUCTURAL ENGINEER <br />a I I OUNT VERNON GLEN BACHMAN PND ENGINEERS, INC. <br />• 'bq �� I I I <br />s TOM STIGER <br />I EVERETT I City of Everett Permit Services <br />� ,A/AN DE �� � ' DAVID SIMPSON ..s,.. <br />EVERETT NORTH MARINA ' i I I II REVIEWED FOR CODE COMPLIANCE <br />PROJECT SITE <br />- CEO/EXECUTIVE DIRECTOR By Review Discipline: Public Works <br />� <br />--NATIVE FILL, =F5 LISA LEFEBER Reviewer: AEmerson <br />o <br />SEATTLE BORROW SITE a Date: 07/14/2025 <br />IIIIIIIIIIII I <br />I o Review Status: Approved for Permit <br />I MARINA DIRECTOR PP <br />PAaRC TACOMA q �— - og JEFF LINDHOUT <br />°�^NA ��i Approved with redlines. <br />,n OLYMPIA f _ <br />3 a �JI-�LJ^I O CHIEF OF <br />Y <br />r__ _ r�A A ENGINEERING & PLANNING <br />LOCATION MAP I JOHN KLEKOTKA, P.E., S.E. <br />SCALE: NOT TO SCALE - <br />_ _ E PROJECT MANAGER <br />ELISE GRONEWALD, P.E., PMP DATUM <br />z S TEJECT ELEVATION DATUM FOR THIS PROJECT IS 0.0' MEAN <br />LOWER LOW WATER (MLLW) <br />z TIDAL DATA <br />0 <br />o BASED ON NOAA's PUBLICATION SHEET "WASHINGTON <br />944-7659", DATED 9/29/1988, THE RELATIONSHIP <br />, CENTRAL MARINA BETWEEN 1 1929 AND MLLW DATUMS FOR EVERETT, <br />z POSSESSION SOUND, FOR THE TIDAL EPOCH 1960-1978 <br />IS AS FOLLOWS: <br />9 <br />DIGITAL SIGNATURE: HIGHEST RECORDED TIDE: ESTIMATED (EHW) +14.35' <br />MEAN HIGHER HIGH WATER (MHHW) +11.11' <br />S a MEAN HIGH WATER (MHW) +10.25' <br />NGVD 1929 +5.93' <br />o THIS DRAWING SET WAS CREATED AS AN ELECTRONIC - MEAN LOW WATER ATE +0.00' <br />WATER <br />MEAN LOWER LOW W <br />DOCUMENT. IF THE ELECTRONIC DOCUMENT DOES NOT R (MLLW) .0' <br />v INCLUDE A VERIFIABLE DIGITAL SIGNATURE IN THE BOX PROJECT LOCATION LOWEST OBSERVED WATER LEVEL (6/02/77) -3.60' <br />ABOVE, PLEASE CONTACT THE ENGINEER OF RECORD SCALE: NOT TO SCALE EXTREME LOW WATER (ELW) -4.50' <br />n FOR THE ORIGINAL CERTIFIED ELECTRONIC DOCUMENT. <br />IF THIS DRAWING IS NOT 22%34" SCALE ACCORDINGLY. AS — B U I LTS <br />Ii PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. NO. <br />ZPND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY BRUCF J. KEISER NOTED T1.01 <br />Port of PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE <br />� CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. E°FwAs"' c � DESIGNED BY: DATE: <br />3240 Hasdzke Avenue E`5Ps C 2 BUILDING ABATEMENT <br />O ® ® I ® WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT, A C. CASTONA JANUARY 2025 CIP No. 6-8-007-01 <br />Sea�de, zhi ggr 98102 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF & DEMOLITION <br />EVERETT P: 206.624.1387 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY �Lj m DRAWN BY CHECKED BY <br />ENGINN.Ir RS, INC. —pnde 01 7 JBK AS-BUILTS AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN o m�'3278s Eo ="' G. DEAN W. THOMPSON PROJECT <br />n nginee�s.com /'/'-•' APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED F ��s.ea �� <br />(425) 259-3 No. PD-WP-2025-03 <br />P.O. BOX WA 98206 o 1/27/25 JBK ISSUED FOR PERMIT & BID IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT sS�ONAL APPROVED BY: TITLE SHEET <br />\ EVERETT, DIRECTLY OR INDIRECTLY TO PND. <br />164 No. DATE BY REVISION SHEET N0. 1 OF 26 <br />