My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1313 75TH ST SW BLDG A 2026-05-06
>
Address Records
>
75TH ST SW
>
1313
>
1313 75TH ST SW BLDG A 2026-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 10:25:38 AM
Creation date
4/15/2026 8:10:43 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1313
Unit
BLDG A
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />EVERETT <br />WASHINGTON Permit Services Transmittal <br />PERM IT/PROJ ECT #: M2503-111 <br />SITE ADDRESS: 1313 75th St SW, Blda 1, Everett, WA 98203 <br />PROJECT NAME: Mechanical Tank Installation <br />FROM <br />PHONE #: <br />COMPANY: Helion Enerav <br />EMAIL: tlandry@helioneneray.com <br />OFFICE USE ONLY <br />Date Received Stamp <br />❑ Chronology — Permit Counter Transmittal <br />❑ Plan Review Routing <br />Location: []File ❑Reviewer Office <br />Date Logged: By: <br />Route to: (Check all that apply) <br />Name of Reviewer <br />Type of Review <br />❑ Planning <br />Reviewer Name: <br />❑ Re -Review <br />❑ Public Works <br />Reviewer Name: <br />❑ Revisions After Approval <br />❑✓ Building <br />Reviewer Name: Scott Schreffler <br />❑ Revisions After Issuance <br />❑ Fire <br />Reviewer Name: <br />❑✓ Other <br />❑ Other <br />Reviewer Name: <br />❑ Other <br />Provide auantities for all items submitted <br />PLANS <br />REPORTS/CALCULATIONS <br />OTHER DOCUMENTS <br />Qty <br />city <br />Qty <br />Architectural/Building Plans <br />_ Geotechnical Report <br />Correction Letter Responses <br />Structural Plans <br />_ Drainage Report <br />Draft Easement <br />Civil Plans <br />_ SWPPP Report <br />Recorded Easement <br />1 Site Plan <br />_ Wetland Report <br />Height Survey <br />Landscape Plan <br />_ Critical Area Report <br />Base Elevation Survey <br />Survey <br />_ Traffic Study/TDM Report <br />Critical Area Covenant <br />Elevations <br />Structural Calculations <br />Stormwater Covenant <br />Floor Plans <br />_ Height Calculations <br />Covenant - Other <br />Special Inspection Report <br />_ Plumbing Calculations <br />Performance Guarantee <br />As-Builts <br />_ Other <br />Warranty Bond <br />Plat Maps <br />_ Other <br />Other <br />Original City Redlines Returned <br />_ Other <br />Other <br />Other <br />_ Other <br />Other <br />Other <br />Other <br />Other <br />Items submitted are: <br />❑ Complete Plan Set Replacement ❑✓ Additional Documents <br />(Slip -sheeting not permitted) (To be added to file) <br />Comments to Reviewer: FOR CHANGES IN SCOPE: <br />Added site -plan to submission via online portal Revised Description of Work: <br />Revised Valuation: <br />Signed: Tyler Landry Date: 4/16/2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.