My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2710-03
>
Ordinances
>
Ordinance 2710-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2014 2:57:27 PM
Creation date
6/13/2014 2:57:27 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2710-03
Date
8/27/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 2710-03 <br /> AN ORDINANCE creating a special improvement project entitled "10t <br /> Street - Pine Street to East Marine View Drive," Fund 303, Program 050, <br /> to accumulate all costs for the improvement project and repealing <br /> Ordinance No. 2508-01. <br /> WHEREAS, the City of Everett is committed to a planned pedestrian safety and mobility improvement <br /> program; and <br /> WHEREAS, the City of Everett has identified the need and received a Transportation Improvement <br /> Board (TIB) grant for improvements to 10th Street between Pine Street and East Marine View Drive; <br /> and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 050, entitled "10th Street - <br /> Pine Street to East Marine View Drive," to accumulate all costs for the improvement project and <br /> repealing Ordinance No. 2508-01. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 303, Program 050, <br /> for the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Engineering/Public Services Director," under direction of the <br /> Mayor, to assume full and complete responsibility for conducting all tasks and doing all things to <br /> accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of $194,218.00 is hereby appropriated to Fund 303, Program 050, "10th Street - Pine Street to <br /> East Marine View Drive," as follows: <br /> A. Estimated Project Costs <br /> Design Engineering $ 33,566.00 <br /> Construction 160,652.00 <br /> Total Estimated Cost $ 194,218.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.