My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6745
>
Resolutions
>
Resolution 6745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 2:17:49 PM
Creation date
6/18/2014 2:17:39 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
6745
Date
6/11/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/%0/11m <br /> ,1111 <br /> RESOLUTION NO. 6745 <br /> A RESOLUTION adopting the Annual Transportation Improvement <br /> Program (TIP) update for 2015 to 2020. <br /> WHEREAS, RCW 35.77.010 requires that the legislative body of each city and town <br /> shall prepare and adopt a"Comprehensive Transportation Program" for the ensuing six <br /> calendar years to serve as a guide in carrying out a coordinated transportation facility <br /> construction program, and that said legislative body shall annually thereafter review, <br /> amend as necessary, and readopt said Comprehensive Transportation Program; and <br /> WHEREAS, in compliance with RCW 35.77.010 there exists such a Comprehensive <br /> Transportation Program (known as the Six-year Transportation Improvement Program or <br /> TIP) for the City of Everett that identifies various types of transportation improvements <br /> needed, and estimated costs; and <br /> WHEREAS, The City Council of the City of Everett has reviewed the work <br /> accomplished under said program, determined current and future City transportation <br /> needs, and based on these findings has prepared a Six-year Transportation Improvement <br /> Program for the next six years; and <br /> WHEREAS, Everett's Transportation Advisory Committee and Planning Commission <br /> have reviewed and recommended approval of this update; and <br /> WHEREAS, the adoption of the update to the City of Everett Transportation <br /> Improvement Program enables the City to apply for and receive various state and federal <br /> funds to implement the projects in the program; and <br /> WHEREAS, after due notice, a hearing on the proposed program was held by the City <br /> Council in accordance with RCW 35.77.010; and <br /> WHEREAS, the proposed program is consistent with, and implements the City of <br /> Everett Comprehensive Plan; <br /> NOW, THEREFORE, BE IT RESOLVED by the City Council of Everett that the <br /> 2015-2020 annual update of the Six-year Transportation Improvement Program, a copy <br /> of which is attached hereto as Exhibit A and incorporated herein as if fully set forth, is <br /> adopted and the City Engineer is directed to file a copy of this program with the <br /> Washington State Secretary of Transportation pursuant to RCW 35.77.010 and pursue <br /> funding for the projects cited in the program wherever available. <br /> Yoe,,, Z� <br /> uncilmem er Intro <br /> oV1 esolution <br /> PASSED and APPROVED this 11 day of June, 2014. <br /> ____Atoil....ik..._ <br /> ouncil President <br />
The URL can be used to link to this page
Your browser does not support the video tag.