My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5360
>
Resolutions
>
Resolution 5360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2017 10:47:28 AM
Creation date
2/14/2017 10:47:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5360
Date
7/9/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#rrm■—al <br /> RESOLUTION NO. 5360 <br /> A RESOLUTION RESCHEDULING DATE OF PUBLIC HEARING FOR DETERMINATION TO USE <br /> GENERAL CONTRACTOR/CONSTRUCTION MANAGER(GC/CM)ALTERNATIVE PUBLIC <br /> WORKS METHOD FOR CONSTRUCTION OF WPCF UPGRADE, SCHEDULE A. <br /> WHEREAS, City Council passed Resolution 5345 on June 4, 2003, in which Council <br /> preliminarily determined to use the General Contractor/Construction Manager(GC/CM) <br /> alternative public works method for construction of its Water Pollution Control Facility; and <br /> WHEREAS, Resolution 5345 set a hearing date, as required by law; <br /> WHEREAS,the Public Works department needs to reschedule the public hearing; <br /> NOW,THEREFORE, THE CITY OF EVERETT CITY COUNCIL DOES RESOLVE: <br /> A public hearing shall be held on August 6, 2003 a.m. during the Council's weekly meeting, <br /> which commences at 8:30 a.m. City Council will accept oral and written comments at that public <br /> hearing regarding the appropriateness of using the GC/CM alternative public works procedure of <br /> public works contracting. <br /> • • _ ' son Introducing,;•'olution <br /> PASSED AND APPROVED this 9th day of July , 2003 <br /> Gam- <br /> _ <br /> A 4 n Hatloe, C! ncil President <br />
The URL can be used to link to this page
Your browser does not support the video tag.