My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2167-96
>
Ordinances
>
Ordinance 2167-96
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 11:56:31 AM
Creation date
3/16/2017 11:56:30 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2167-96
Date
8/28/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1W4IV-- <br /> EL4FETT <br /> ORDINANCE NO. 2167-96 <br /> AN ORDINANCE amending Ordinance No. 1879-92 entitled <br /> "Animal Shelter Construction" Fund No. 367, Program 920, <br /> authorizing the design and construction of a new animal shelter. <br /> WHEREAS the City Council has recognized the need for a new animal <br /> shelter within the City of Everett; and <br /> WHEREAS the City Council directed Administration to proceed with planning <br /> and site development for the Animal Shelter on City owned property; and <br /> x <br /> WHEREAS Ordinance No. 1879-92 was established to fund the construction <br /> of the Animal Shelter; and <br /> WHEREAS the final costs for the animal shelter have exceeded the original <br /> appropriation; <br /> NOW THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1 : A special construction fund is hereby established as Fund No. <br /> 367, Program 920, entitled "Animal Shelter Construction" to accumulate the <br /> design and construction costs required to construct a new animal shelter. <br /> Section 2: Authorization is hereby granted to the Facilities/Property <br /> Management Director under the administration of the Mayor, to assume full <br /> responsibility for conducting all tasks and performing all necessary steps to <br /> accomplish the actions authorized by this Ordinance. <br /> Section 3: Section 3 of Ordinance No. 1879 92 which reads as follows: <br /> The estimated cost of the project authorized is $1 ,000,000 including all <br /> costs related to design, construction, equipment and furnishings, contract <br /> administration and their associated costs. <br /> be and the same is hereby amended to read as follows: <br /> The estimated cost of the project is $1 ,579,115 including costs related to <br /> design, construction, equipment and contract administration. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.