My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2166-96
>
Ordinances
>
Ordinance 2166-96
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 11:57:37 AM
Creation date
3/16/2017 11:57:35 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2166-96
Date
8/28/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 2166-96 <br /> AN ORDINANCE creating a special improvement <br /> project entitled "Seaway Boulevard/SR-526 Intersection <br /> Improvements", Fund 303, Program 019, to accumulate <br /> all construction costs for the improvement project. <br /> WHEREAS, the City of Everett is committed to a traffic improvement program; and <br /> WHEREAS, the City of Everett has completed the design of improvements to the <br /> Seaway Boulevard and SR-526 intersection; and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 019, <br /> entitled "Seaway Boulevard/SR-526 Intersection Improvements" to accumulate all <br /> construction costs for the improvement project. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund <br /> 303, Program 019, for construction of the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Engineering/Public Services Director", under <br /> direction of the Mayor, to assume full and complete responsibility for conducting all <br /> tasks and doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of $275,750 is hereby appropriated to Fund 303, Program 019, "Seaway <br /> Boulevard/SR-526 Intersection Improvements" as follows: <br /> A. Estimated Project Costs <br /> Construction $ 275,750 <br /> Total Estimated Cost $ 275,750 <br />
The URL can be used to link to this page
Your browser does not support the video tag.