My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2131-96
>
Ordinances
>
Ordinance 2131-96
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 10:42:42 AM
Creation date
3/21/2017 10:42:41 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2131-96
Date
3/6/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> ORDINANCE NO.oVe /-96 <br /> AN ORDINANCE creating a special improvement project entitled <br /> "SR526/I-5 Eastbound to Northbound Ramp", Fund 304, to <br /> accumulate all construction costs for the improvement project <br /> and repealing Ordinance 1986-94. <br /> WHEREAS, the construction of a ramp to accommodate the easterly traffic movement of <br /> SR526 to the northerly traffic movement on Interstate 5 was identified as a Boeing EIS <br /> Mitigation measure; and <br /> WHEREAS, the City of Everett, the Washington State Department of Transportation and the <br /> Federal Highway Administration have developed the final design plans for the ramp; and <br /> WHEREAS, the State of Washington has allocated funding for this improvement project; and <br /> WHEREAS, based on construction costs, additional funding and other improvements, there is <br /> a need to revise the existing ordinance; <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 304, entitled "SR526/I-5 <br /> Eastbound to Northbound Ramp" to accumulate all costs for the improvement project, and <br /> repealing ordinance 1986-94. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments, from Fund 304, for <br /> construction of the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Engineering/Public Services Director", under <br /> direction of the Mayor, to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of $ 14,367,709.00 is hereby appropriated to Fund 304, "SR526/I-5 Eastbound to <br /> Northbound Ramp" as follows: <br /> A.Estimated Project Costs <br /> Construction $ 14,367,709 <br /> Total Estimated Cost $ 14,367,709 <br />
The URL can be used to link to this page
Your browser does not support the video tag.