My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/03/05 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/03/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 9:06:58 AM
Creation date
3/22/2017 9:06:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/5/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL PRELIMINARY AGENDA <br /> 8:30 A.M., WEDNESDAY, MARCH 5, 2008 <br /> CITY COUNCIL CHAMBERS <br /> Roll Call <br /> Pledge of Allegiance <br /> Approval of Minutes: February 27, 2008 <br /> Mayor's Comments <br /> Council - Due to council members attending National League of Cities, the council <br /> meeting of March 12, 2008 has been moved to Friday, March <br /> 14, 2008 beginning at 830 a.m. <br /> City Attorney <br /> Citizen Comments <br /> CONSENT ITEMS: <br /> (1) Adopt Resolution No. authorizing claims against the city of Everett in the amount of <br /> $4,126,953.70 for the period of February 16, 2008 through February 22, 2008 <br /> (2) Adopt Resolution No. authorizing payroll claims against the city of Everett in the amount <br /> of $3,096,599.20 for the period ending February 16, 2008 <br /> (3) Adopt Resolution No. authorizing electronic transfers against the city of Everett in the <br /> amount of $ 4,836,789.66 for the period of January 1, 2008 through January 31, 2008 <br /> ACTION ITEMS: (to be considered individually) <br /> (4) Award Bid for Senior Center Activity Center-Exterior Building Renovation to TCM General <br /> Construction, Inc. in the amount of $497,931.00 <br /> (5) Authorize the Mayor to sign the Professional Services Agreement with Murray, Smith and <br /> Associates for the North Creek Low Flow Augmentation Project, Phase 3 in the amount of <br /> $72,676.00 <br /> (6) Authorize the Mayor to sign a Professional Services Agreement with Northwest Corrosion <br /> Engineering for engineering services not to exceed $25,000 <br /> (7) Authorize the Mayor to sign the Professional Services Agreement with Brown and Caldwell to <br /> design a by-pass from the primary sedimentation tank at the Water Pollution Control Facility in <br /> the amount of $39,906. <br /> (8) Authorize the Mayor to sign a Professional Services Agreement with RoseWater Engineering for <br /> the 126th Street SE Drainage Improvement Project in the amount of $31,930.00 <br /> AGENDA CONTINUED ON THE BACK OF THIS PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.