My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2056-95
>
Ordinances
>
Ordinance 2056-95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 11:10:56 AM
Creation date
3/23/2017 11:10:55 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2056-95
Date
5/31/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
147"s, <br /> ORDINANCE NO. 2056-95 C 'iETT <br /> • <br /> AN ORDINANCE creating a special improvement project entitled <br /> "West Marine View Drive - 10th Street to 18th Street", Fund <br /> 303, Program 010, to accumulate all design and construction <br /> costs for the improvement project. <br /> WHEREAS, the City of Everett is committed to the construction of street improvements <br /> which include widening, curbs, gutters, storm drainage, sidewalk and other traffic safety <br /> improvements on West Marine View Drive between 10th Street and 18th Street; and <br /> WHEREAS, this project has been approved for funding by the Transportation Improvement <br /> Board, WSDOT and the Port of Everett; and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 010, entitled "West <br /> Marine View Drive - 10th Street to 18th Street" to accumulate all costs for the improvement <br /> project. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br /> Program 010, for design and construction of the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Engineering/Public Services Director", under <br /> direction of the Mayor, to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of $1,582,662.00 is hereby appropriated to Fund 303, Program 010, "West Marine <br /> View Drive - 10th Street to 18th Street" as follows: <br /> A.Estimated Project Costs <br /> Predesign $ 14,000 <br /> Design $ 74,000 <br /> Right of Way $ 275,000 <br /> Construction $ 1,233,662 <br /> Total Estimated Cost $ 1.596.662 <br /> B. Source of Funds <br /> Fund 157 - Traffic Mitigation $ 72,000 <br /> Fund 301 - Arterial Streets $ 155,331 <br /> WSDOT $ 278,000 <br /> Port of Everett $ 300,000 <br /> Transportation Improvement Board $ 791,331 <br /> Total Estimated Funds $ 1.596.662 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.