My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3590-18
>
Ordinances
>
Ordinance 3590-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2018 8:45:35 AM
Creation date
2/20/2018 8:45:34 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3590-18
Date
2/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/IP <br /> ORDINANCE NO. 3590-18 <br /> AN ORDINANCE creating a special improvement project entitled, <br /> "Citywide Innovative Safety Project," Fund 303, Program 111, to <br /> accumulate all costs for the improvement. <br /> WHEREAS,the City of Everett is committed to a planned pedestrian safety program; and <br /> WHEREAS, the City of Everett has identified the need and obtained funds to construct certain <br /> pedestrian safety improvements; and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 111, entitled <br /> "Citywide Innovative Safety Project,"to accumulate all costs for the improvement. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br /> Program 111, for the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Public Works Director" or"City Engineer,"under <br /> direction of the Mayor,to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of$711,300 is hereby appropriated to Fund 303, Program 111, "Citywide Innovative <br /> Safety Project," as follows: <br /> A. Estimated Project Costs <br /> Design and Construction $ 711,300 <br /> Total Estimated Cost $ 711,300 <br /> B. Source of Funds <br /> Federal Grant- HSIP $ 640,170 <br /> Fund 119- Street Improvements 71,130 <br /> Total Estimated Funds $ 711,300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.