Laserfiche WebLink
4 <br /> ' Earth <br /> I Solutions <br /> NW LIC <br /> September 7, 2018 Earth Solutions NW LLC <br /> ES-6132 Geotechnical Engineering, Construction <br /> Observation/Testing and Environmental Services <br /> Mr. Bill Messner <br /> 1920 Grand Avenue <br /> Everett, Washington 98201 <br /> Subject: Geotechnical Plan Review <br /> Messner Retaining Wall <br /> 1920 Grand Avenue <br /> Everett, Washington <br /> Reference: CG Engineers <br /> Plan Sheets SH0.1 to SH3.1 <br /> Dated August 30, 2018 <br /> Earth Solutions NW, LLC <br /> Geotechnical Design Criteria <br /> Proposed Soldier Pile Wall <br /> Dated May 25, 2018 <br /> Dear Mr. Messner: <br /> In accordance with your request, Earth Solutions NW, LLC (ESNW) has reviewed the <br /> referenced plan sheets and soldier pile wall design. ESNW previously provided earth pressure <br /> and related geotechnical criteria for design of the proposed wall and related stabilization efforts. <br /> Based on our review, the geotechnical recommendations have been appropriately incorporated <br /> into the referenced plan sheets and design of the soldier pile wall. <br /> We trust this letter and geotechnical plan review meet your current needs. If you have any <br /> questions, or if additional information is required, please call. <br /> Sincerely, <br /> EARTH SOLUTIONS NW, LLC koap A Co ' 4 <br /> i. . - a- 0. <br /> s , <br /> Raymond A. Coglas, P.E. t <br /> Principal Engineer , .r ,/, 3001 . <br /> \ 4,,,,44:0,S.,,,,,,,,r I ^I, <br /> cc: CG Engineering <br /> Attention: Mr. Dennis Titus (Email only) <br /> l/2 <br /> 1805- 136th Place N.E.,Suite 201 • Bellevue,WA 98005 • (425)449-4704 • FAX(425)449-4711 <br />