Loading...
HomeMy WebLinkAboutOrdinance 766-81 • • • ORDINANCE NO. W-1/ An Ordinance amending the Zoning Map of the City of Everett as provided by Municipal Code, Title 19, Ordinance No. 3572 Rezone No. 4-80, Seattle North Dev. Company South of 100th St., West of I-5 WHEREAS, on January 27, 1981, the Planning Commission held a public hearing regarding rezoning the hereinafter described property from R-3, Multiple-Family Low- Density Residential to C-1, General Commercial, but did not make a recommendation to City Council, and WHEREAS, the City Council of Everett, in response to an appeal by the Applicant, J.F. Harper, has determined that said property should be rezoned and zoned C-1, General Commercial, NOW, THEREFORE, the City of Everett does ordain: Section 1: That the City Council of the City of Everett does hereby find that the zoning change hereinafter set forth is in the best interest of the City of Everett and meets the purpose of the Comprehensive Plan. Section 2: That the proposed zoning is based on the Applicant meeting the conditions stated in the attached Concomitant Agreement. Section 3: That the zoning map of the City of Everett as established by Everett Municipal Code Title 19 (Ord. No. 3572, Sec. 4 as amended) is hereby amended from R-3, Multiple-Family Low-Density Residential to C-1, General Commercial for the following described property. That portion of the northwest quarter of the northeast quarter of Section 19, Township 28 north, range 5 east, W.M., described as follows: Commencing at the northeast corner of said subdivision; thence north 87° 49' 05" west along the north line thereof 347.60 feet to the true point of beginning; thence south 02° 10' 55" west 345 feet; thence north 87 49' 05" west 604.71 feet to the east line of the Puget Sound Power & Light Company right of way, now held of record by Public Utility District No. 1 of Snohomish County and established by deed recorded under Auditor's File No. 178970; thence north along said east line 345 feet to the north line of said subdivision; thence east along said north line 604.71 feet to the true point of beginning. Together with that portion of said northwest quarter of the northeast quarter lying west of said Puget Sound Power & Light Company right of way and lying easterly and northerly of the northeasterly line of a road strip being 60 feet in width lying 30 feet on each side of the following described centerline: commencing at the northwest corner of said subdivision; thence south 00° 49' 05" east 33.13 feet to a point on the centerline of said parcel of land also being the true point of beginning; thence south 23° 19' 05" east 195.43 feet to the beginning of a tangent curve concave northeasterly; thence along said curve having a radius of 275 feet through a central angle of 49°31' 17" an arc distance of 237.69 feet to a point on the westerly line of said Puget Sound Power & Light Company right of way and the terminus of said centerline; except the north 30 feet thereof west of said Puget Sound Power & Light Company right of way. Section 4: That the Official Zoning Maps in the Building and Planning Departments of the City of Everett shall, upon passage of this Ordinance, be amended as hereinabove provided, and henceforth said property shall be used in accordance with the zone in which the same is now established, as provided by Everett Municipal Code Title 19, (Ord. No. 3572 as amended), and in accordance with development requirements stated in the attached Concomitant Agreement. • • Section 5: That failure to meet the conditions of the attached Concomitant Agreement shall result in reconsideration of this rezone action by City Council. Section 6: That the City Clerk is hereby instructed to file the duly certified copy of this Ordinance with the Auditor of Snohomish County, Washington. CITY OF EVERETT Mayor ATTEST: y Clerk - r PASSED: 3-//- VALID: - ?- ,' PUBLISHED: q'-/- 6e! CONCOMITANT AGREEMENT TO REZONE ORDINANCE NO. 7‘‘ S f This Agreement, made and entered into this f� day of� y , 1981 by and between the City of Everett, a municipal corporation, hereinafter called the City and Seattle North Development, owner hereinafter called the Sponsor, WITNESSETH: WHEREAS, the Sponsor has made application to the City for a change in the I classification of the land south of 100th Street and west of I-5, located in the City of Everett and County of Snohomish, Washington from R-3 Multiple-Family Low-Density to C-1 General Commercial and, ii WHEREAS, the said rezone contemplated will necessitate all the conditions specified on said legal described property, That portion of the northwest quarter of the northeast quarter of Section 19, Township 28 north, range 5 east, W. M., described as follows: Commencing at the northeast corner of said subdivision; thence north 87°49'05" west alog the north line thereof 347.60 feet to the true point of beginning thence south 02 10'55" west 345 feet; thence north 87°49'05" west 604.71 feet to the east line of the Puget Sound Power & Light Company right of way, now held of record by Public Utility District No. 1 of Snohomish County and established by deed recorded under Auditor's File No. 178970; thence north along said east line 345 feet to the north line of said subdivision; thence east along said north line 604.71 feet to the true point of beginning. Together with that portion of said northwest quarter of the northeast quarter lying ', west of said Puget Sound Power & Light Company right of way and lying easterly and northerly of the northeasterly line of a road strip being 60 feet in width lying 30 feet on each side of the following described centerline: commencing at the northwest corner of said subdivision: thence south 00°08'24" east along the west line thereof 30.02 feet; thence soth 87°49'05" east 33.13 feet to a point on the centerline of said ( parcel of land also being the true point of beginning; thence south 23°19'05" east 195.43 feet to the beginning of a tangent curve concave northeasterly thence along said curve having a radius of 275 feet through a central angle of 49 31'17" an arc distance of 237.69 feet to a point on the westerly line of said Puget Sound Power and Light Company right of way and the terminus of said centerline; except the north 30 feet thereof west of said Puget Sound Power and Light Company right of way. Situate in the county of Snohomish, state of Washington. NOW, THEREFORE, in consideration of the City Council of the City of Everett changing the classification of the above described property from R-3 Multiple-Family to C-1 General Commercial, the Sponsor hereby covenants and agrees as follows: • 1. That the site development be in conformance with the site plan submitted January 5, 1980 with the modifications required in the Staff Report to Planning Commission. j I i' 1,1 1' 1 • 2. That a detailed landscaping plan be prepared by the applicant and approved by the Park and Planning Departments prior to any construction on the site. The applicant shall provide a bond or other financial commitment, to insure maintenance of the landscaping and to replace any dead loss that occurs in the first two years of operation. There shall be at a minimum 56 evergreen trees (not to include Fir or Hemlock) on 20 foot centers provided on the south, west, and east sides of the site, a minimum of 8 feet in height at time of planting, to lessen the visual impact of the massive warehouse structure on the adjacent residential uses.* In addition, the landscaping plan shall provide for additional planting of the south, east and west sides of the site to complement the tree planting and to provide a substantial ground cover. * The type of planting on the west side of the site shall be chosen so as to not adversely impact Snohomish County P.U.D. #1 power lines adjacent to the site. 3. The south and east sides of the site shall be bermed so that not more than 25 feet of the proposed warehouse wall is visible from the south and east. 4. A detailed drawing shall be submitted to the Public Works Department showing parking layout, landscaping, driveways, utilities, storm drainage, and all required improvements to the public right-of-way. Public Works Department approval of these drawings is required before any permits are issued. All improvements shall be completed before the Occupancy Permit is issued. As-builts, easement, and a one year Warrantee bond in the amount of 10% of the cost of construction of the public water system are required within 10 working days of obtaining public water connection. 5. City streets are to be kept clear of dirt and debris during construction. 6. During construction, all truck traffic to and from the site within the City of Everett shall be on arterial streets unless otherwise approved by the Public Works Department. 7. Current sewer connection fee for warehouse land use is $.0213/sq. ft. 8. A storm water detention system acceptable to the Public Works Department shall be provided. 9. Applicant must clarify if access is to be by easement, as suggested on site plan. 10. Provide Power of Attorney for street improvement LID's on: a) 100th (7th to PUD) b) North/south Arterial c) South Broadway 11. Show perpetual access agreement to Mall. 12. All buildings to be set back 40 feet from North section line. 13. A 20 foot easement 10 feet on each side of installed line is required for public waterlines within the site. 14. Correct vicinity sketch to reflect public ownership of street right-of-way rather than "Private Road" west of PUD. • t i 1 1 15. This agreement shall run with the land covered hereby and shall be binding upon the successors and assigns of the Sponsor. The covenants, agreements and conditions herein contained shall extend to and be obligatory upon and inure to the benefit of any corporation to be formed by the Sponsor for construction and operation of any proposed use included in C-1 Zoning district, City of Everett i Zoning Code 113752. j CITY OF EVERETT ) ATTEST: , "9_1,:e __„,9 2— I«L �/ ,t¢---- C' lerk -. 1>4r/'tTY Mayor I I SEATTLE NORTH DEVELOPMENT I 1 7- / 2A,,,, 1 .i I I 1 I Y 1 i. I' 1 1 1 I 1 64,