My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
909 SE EVERETT MALL WAY IIZUNA CIDER 2019-09-05
>
Address Records
>
SE EVERETT MALL WAY
>
909
>
IIZUNA CIDER
>
909 SE EVERETT MALL WAY IIZUNA CIDER 2019-09-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 9:12:48 AM
Creation date
9/5/2019 9:12:43 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
909
Tenant Name
IIZUNA CIDER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iizuna Cider February 25,2019 <br /> Comment Response Page 2 of 2 <br /> c. The analysis shall consider the full weight of the mechanical unit unless the reduced <br /> tributary load is substantiated. <br /> The full weight of the mechanical unit is supported by(2)new 6 X 8 beams which span <br /> between the existing 5-1/8"X 16-1/2"GLB's running north-south.Thus,the full weight of <br /> the mechanical unit was divided by(4)support points for the analysis of the 5-1/8"X 16- <br /> 1/2"GLB's.In the analysis of the 6-3/4"X 27"GLB,the reactions from the 5-1/8"X 16-1/2" <br /> GLB's with and without the mechanical unit were compared to determine the additional <br /> load from the full weight of the mechanical unit. <br /> d. The analysis shall explicitly evaluate the negative bending moment in the beam considering <br /> the full loads on both spans to maximize the moment. <br /> Refer to the supplemental calculations dated 02/25/19 for the negative bending moment <br /> analysis of the 6-3/4"X 27"GLB. <br /> e. Continuing with the previous comment,the analysis shall consider the concentrated loads at <br /> the end of the cantilever span from the adjacent existing 31.5"glulam. These do not appear <br /> to be considered in the calculations. <br /> The reaction from the adjacent existing 31-1/2"deep GLB on the end of the cantilever of <br /> the 6-3/4"X 27"GIB is included in the supplemental calculations dated 02/25/19. <br /> If you have any questions or comments regarding the responses to this review, please do not hesitate to <br /> call. <br /> Sincerely, <br /> CG Engineering <br /> 9ae <br /> Mike Maechler, PE,SE <br /> Project Manager <br /> (7;/- <br /> O 250 4th Avenue South,Suite 200 <br /> Edmonds,WA 98020 <br /> ENGINEERING ph.425.778.8500 I f.425.778.5536 <br /> www.cgengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.