Laserfiche WebLink
INTERP <br /> L ...1 <br /> Big Lots Everett, WA <br /> March 21, 2019 <br /> Page 2 of 2 <br /> As a convenience we have added the sheets that were revised to meet <br /> the requirements of the Planning Department review (sheets A-1.4, M-1, <br /> M-3) as well as providing the equipment screen Manufacturer's color <br /> chart, technical data, and installation instructions. <br /> Attachments T-1, A1.1, A-1.4, M-1, M-3, Louver Manufacturer's, Color chart, Installation <br /> instructions, and technical cut sheet. <br /> Please feel free to contact me if you have any questions or require additional information. If I <br /> am not available, Tan Vu is the Architectural Project Manager and will be able to answer your <br /> questions. <br /> Sincerely, <br /> INTERPLAN LLC <br /> Gabby Gil <br /> Permit Coordinator <br />