My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F D Thomas Inc 9/9/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2020
>
F D Thomas Inc 9/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:10:38 AM
Creation date
9/10/2019 10:08:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
F D Thomas Inc
Approval Date
9/9/2019
Council Approval Date
8/28/2019
End Date
2/13/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everpark Garage Structural Repairs
Tracking Number
0001981
Total Compensation
$1,386,761.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett <br /> ' Everpark Garage Repairs Addendum No. 2 <br /> EVERETT / / <br /> WASHINGTON <br /> ADDENDUM NO. 2 <br /> ' TO <br /> EVERPARK GARAGE REPAIRS <br /> #2018-034 <br /> ' June 13, 2019 <br /> NOTICE TO BIDDERS <br /> Addendum No. 2 contains the following revisions, additions, deletions and classifications and is <br /> ' hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> ' Bidders must acknowledge receipt of addendum No.2 in the space provided on page section 00 <br /> 4113-2 in the Bid Form. Failure to comply with this requirement may render the Bid non- <br /> responsive and may cause rejection. <br /> This Addendum No.2 consist of 2 pages, including all revisions, attachments. <br /> ' SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> ITEM 1—Revise call out 13/S.10 on Sheet S.7 to read 20/S.10. <br /> ' ITEM 2— Revise call out 2/5.10 on Sheet S.8 to read 20/S.10. <br /> ITEM 3—Revise call out 19/S.10 on Sheet S.8A to read 14/S.10. <br /> ' ITEM 4— Revise "FRP MATERIALS" section on Sheet S0.0 to add BASF Mbrace Systems <br /> ' ITEM 5— For specification Section 03 0130 72, Section 1.2 A, add Item 4: Milliken Infrastructure, <br /> 920 Milliken Rd., Spartanburg, SC 29303. Tel: 1-855-655-6750 <br /> ' ITEM 6—For specifications Section 03 0130 72,Section 2.1, add section E: RenewWrap or <br /> Velaglass by Milliken Infrastructure, 920 Milliken Rd., Spartanburg, SC 29303. Tel: 1-855-655- <br /> 6750. 1.The system shall include composite fabric, epoxy, saturant/primer, and primer/filler <br /> that are intended and tested by Milliken Infrastructure for use with the RenewWrap and <br /> Velaglass system. 2. Finishes: Finish to be supplied by Milliken Infrastructure for use with the <br /> t RenewWrap and Velaglass system that matches the appearance and durability of the Tyfo RR <br /> system. 3. Field thickened epoxy matrix, which is compatible with composite system's resin <br /> matrix, may be used to patch "bugholes" up to 1.5" (40mm) in depth and to fill voids. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.