My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F D Thomas Inc 9/9/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2020
>
F D Thomas Inc 9/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:10:38 AM
Creation date
9/10/2019 10:08:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
F D Thomas Inc
Approval Date
9/9/2019
Council Approval Date
8/28/2019
End Date
2/13/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everpark Garage Structural Repairs
Tracking Number
0001981
Total Compensation
$1,386,761.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> ' Everpark Garage Repairs Addendum No.3 <br /> Response: Omit Specification Section 01 3223—SURVEY AND LAYOUT DATA. This Specification <br /> does not apply to this project. <br /> ' ITEM 22— In reference to the coating on the 4th deck. Will there be an allowance for any <br /> unseen cracks that need to be "route and sealed"? <br /> ' Response: Existing coating can remain in-place where it is found to be a sound substrate for the <br /> new coating. This is anticipated to reduce the need to address concrete cracks, as the concrete <br /> 1 surface may not be exposed at many areas. Exposed cracks greater than 1/16-inches should be <br /> routed to'/-inches and a bond-breaker provided per the coating manufacturer's <br /> ' recommendations. Contractor will submit proposed change order for any unforeseen <br /> conditions or changes identified during construction and will be reviewed and approved by <br /> Consultant and Owner as a change order,see Specification 00 7200, section 6 Changes. <br /> ' ITEM 23— Note the following corrections to Specification 01 2500—SUBSTITUION <br /> PROCEDURES: PART 1—SUBSTITUIONS, Section 1.7, C. DURING BID PERIOD: strike out the <br /> tfollowing from paragraph: with the exception of alternate products for synthetic turf. <br /> This addendum shall be attached to and made part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> END OF ADDENDUM NO.3 <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.