My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 0000 - 8 <br /> Diversion Dam Road Project Phase 3 UT 3707 & UT 3708 <br /> ' BID ITEM 3 - DRILLED HOLES <br /> BID ITEM 4 - HAULING <br /> BID ITEM 5 - ROCK CRUSHING <br /> BID ITEM 6 - TIMBER VALUE CREDIT <br /> ' BID ITEM 7 - ROAD GRADE AND DITCH <br /> BID ITEM 8 - CRUSHED SURFACING BASE COURSE LIFT <br /> BID ITEM 9 - EROSION AND SEDIMENT CONTROL MEASURES <br /> ' BID ITEM 10 -24" CULVERT <br /> BID ITEM 11 -RESTORATION <br /> BID ITEM 12 -FORCE ACCOUNT <br /> ' SCHEDULE B— UT3708 <br /> BID ITEM 13 -HAYBECKER CULVERT REPLACEMENT <br /> BID ITEM 14 -FINAL GRADE LIFT <br /> ' BID ITEM 15 -CRUSHED SURFACING BASE COURSE LIFT <br /> BID ITEM 16 -EROSION AND SEDIMENT CONTROL MEASURES <br /> BID ITEM 17 -RESTORATION <br /> BID ITEM 18 -FORCE ACCOUNT <br /> SECTION 01 3119—COORDINATION AND MEETINGS <br /> 1.1 SECTION INCLUDES <br /> ' 1.2 RELATED SECTIONS <br /> 1.3 PRECONSTRUCTION MEETING <br /> 1.4 REGULAR PROGRESS MEETINGS <br /> ' SECTION 01 3300—SUBMITTAL PROCEDURES <br /> 1.1 SECTION INCLUDES <br /> 1.2 SUBMITTAL PROCEDURES <br /> ' 1.3 CONSTRUCTION PROGRESS SCHEDULE <br /> 1.4 PRODUCT DATA <br /> 1.5 MANUFACTURER'S INSTRUCTIONS <br /> ' 1.6 CONTRACT CLOSEOUT <br /> 1.7 SUBMITTALS REGISTER <br /> ' SECTION 01 4200 — REFERENCES <br /> 1.1 RELATED DOCUMENTS <br /> 1.2 DEFINITIONS <br /> 1.3 INDUSTRY STANDARDS <br /> 1.4 ABBREVIATIONS AND ACRONYMS <br /> SECTION 01 5000—TEMPORARY FACILITIES AND CONTROLS <br /> ' 1.1 DESCRIPTION <br /> 1.2 FIRE PROTECTION AND PROTOCAL <br /> 1.3 TEMPORARY LIGHT AND POWER <br /> ' 1.4 ROADWAY AND TRAFFIC CONTROL <br /> 1.5 ROAD CLOSURE <br /> 1.6 SECURITY <br /> 1.7 TEMPORARY DRAINAGE PROVISIONS <br /> ' 1.8 POLLUTION CONTROL <br /> 2.1 TEMPORARY FACILITIES, EQUIPMENT, AND VEHICLES <br /> 2.2 SAFETY EQUIPMENT <br /> 00 0000 - 8 TABLE OF CONTENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.