Laserfiche WebLink
' City of Everett 00 0000 - 9 <br /> Diversion Dam Road Project Phase 3 UT 3707 & UT 3708 <br /> ' 3.1 TEMPORARY FACILITIES <br /> 3.2 SAFETY EQUIPMENT <br /> SECTION 01 5010- PROTECTION AND MAINTENANCE OF WORK AND PROPERTY <br /> 1.1 DESCRIPTION <br /> 1.2 PUBLIC AND PRIVATE PROPERTY <br /> 1.3 CARE OF EXISTING FACILITIES <br /> ' 1.4 WATER QUALITY-CONTRACTOR REQUIREMENTS <br /> 1.5 EMERGENCIES <br /> 1.6 POWER AND TELEPHONE POLES <br /> ' 1.7 UNDERGROUND, POWER, AND FIBER OPTIC LINES <br /> 1.8 DIVERSION DAM ROAD <br /> 1.9 TREE DAMAGE <br /> 2.1 ETHAFOAM PADS <br /> ' 3.1 WATER QUALITY <br /> SECTION 31 1500-TIMBER HARVEST <br /> ' 1.1 TIMBER DESCRIPTION <br /> 1.2 EXPORTED RESTRICTED <br /> 1.3 BRANDING AND PAINTING <br /> ' 1.4 NO WARRANTIES BY THE CITY <br /> 1.5 SAFE HARBOR AGREEEMENT <br /> SECTION 31 1600- DRILLING AND BLASTING <br /> 1.1 SUMMARY <br /> 1.2 REFERENCES <br /> 1.3 SUBMITTALS <br /> 1.4 PROJECT CONDITIONS <br /> 1.5 DELIVERTY, STORAGE AND HANDLING OF EXPLOSIVES <br /> 2.1 EXPLOSIVE MATERIALS <br /> ' 3.1 LINES, GRADES, AND SLOPES <br /> 3.2 PREPARATION AND PROTECTION <br /> 3.3 POST BLAST INSPECTIONS <br /> ' 3.4 BLASTING <br /> 3.5 REPORTING AND NOTIFICATION <br /> 3.6 SUSPENTION OF BLASTING <br /> ' SECTION 31 2000- EARTH MOVING <br /> 1.1 SUMMARY <br /> 1.2 DEFINITIONS <br /> ' 1.3 SUBMITTALS <br /> 1.4 PROJECT CONDITIONS <br /> 2.1 SOIL MATERIALS <br /> ' 2.2 HARD ROCK MATERIAL <br /> 2.3 DETECTABLE WARNING TAPE <br /> 3.1 GENERAL <br /> 3.2 PREPARATION <br /> ' 3.3 CLEARING <br /> 3.4 DEWATERING <br /> 3.5 EXCAVATION, GENERAL <br /> 1 <br /> 00 0000 - 9 TABLE OF CONTENTS <br />