Laserfiche WebLink
City of Everett 00 7200-26 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> Subcontractors or Suppliers interferes in any way with access to the Owner's property by any <br /> ' persons, the Contractor shall promptly and expeditiously take all reasonable actions to eliminate <br /> or minimize such interference, including but not limited to: (1) utilizing all reasonable means of <br /> restricting any picketing to a single entrance to the Owner's property; (2) posting notices or <br /> signs which advise interested persons and labor organizations that a particular entrance to the <br /> Owner's property is for the employees of"primary" or, as the case may be, "neutral" employers; <br /> (3) policing entrances to ensure that only authorized personnel may use those entrances; (4) <br /> ' notifying all interested labor organizations of the "primary" or "neutral" status of particular <br /> entrances; and (5) in the event any such picketing or concerted activity is unlawful or has a <br /> secondary impact upon the employees of neutral employers, promptly and expeditiously taking <br /> appropriate action to seek recourse through the appropriate governmental agency or state or <br /> ' federal courts to limit the location of such picketing so as to reduce the impact thereof upon <br /> neutral employers. <br /> The Owner will cooperate with the Contractor to accomplish the foregoing actions and will <br /> render assistance as may be in the best interests of the Owner. However, the Owner shall have <br /> the right to direct the Contractor to modify any of the foregoing actions the Contractor has taken <br /> or plans to take or to overrule such actions, to designate the entrances to be used as "primary" <br /> ' or "neutral" entrances, and to take appropriate legal action in order to protect the Owner's <br /> property and interests. In any event, the Contractor shall be liable for all Delays and costs, <br /> including costs to the Owner, and actual damages resulting from the relocation, rerouting, <br /> ' Delays or actions required to maintain the uninterrupted progress of the Work. Failure by the <br /> Contractor to take the actions described above or to comply with the directives of the Owner <br /> shall be considered a breach of this Contract and the Owner may terminate the Contract or <br /> suspend the Contractor as provided in this Contract. <br /> ' 8. MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES <br /> 1 8.1. GENERAL <br /> Unless otherwise specifically stated in the Contract Documents, the Contractor shall provide <br /> and pay for materials, labor, tools, Equipment, water, light, power, transportation, supervision, <br /> ' and temporary construction of any nature, and other services and facilities of any nature, <br /> whatsoever necessary, to execute, complete and deliver the Work within the specified time. <br /> Contractor shall be liable for all power and water costs until Substantial Completion, whether <br /> ' such power or water is provided by temporary or permanent facilities. Owner shall not be liable <br /> for any costs or Delays arising out of or caused by the availability or lack of availability of <br /> permanent power or utilities. Material and Equipment shall be new and of the specified quality. <br /> ' Equipment offered shall be new or current specified models. This requirement does not apply to <br /> minor details, or to thoroughly demonstrated improvements in design or in materials of <br /> construction. Construction Work shall be executed in conformity with the standard practice of <br /> the trade. <br /> ' 8.2. PRODUCT DATA <br /> When specified, the Contractor shall provide data required for inspecting, testing, operating, or <br /> ' maintaining parts of the Work. Unless otherwise specified, such data shall be provided at the <br /> time the referenced material or Equipment is delivered to the job Site. The data shall be as <br /> specified and shall include, unless otherwise specified, such items as shop drawings, erection <br /> ' drawings, reinforcing steel schedules, testing and adjusting instructions, operations manuals, <br /> maintenance procedures, parts lists, and record drawings. Such data shall be provided as part <br /> of the Work under this Contract and its acceptability determined by the Owner in its sole <br /> discretion. <br /> 00 7200 -26 GENERAL CONDITIONS <br />